- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Any Person1
Manufacturer1
Plus 1 duty on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Any Person — also bound by 2340 other Acts
Human Medicines Regulations 2012
184 duties
Merchant Shipping Act 1995
144 duties
Insolvency (England and Wales) Rules 2016
104 duties
Communications Act 2003
92 duties
Road Traffic Act 1988
92 duties
Manufacturer — also bound by 502 other Acts
Measuring Instruments Regulations 2016
85 duties
Human Medicines Regulations 2012
75 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
s.008
Approval of standard plugs
Regulated
- Ensure standard plugs are approved by a notified bodyManufacturer
s.009
Refusals, cancellations and the imposition of conditions
Regulated
Other duties (1) — Crown / regulator
- Notified body must give notice and allow 28 days for representations before making unfavourable decision on plug approvalStatutory regulator
s.012
Prohibitions on supply etc. of appliances
Regulated
- Fit all supplied appliances with a standard UK plug and correct fuseAny Person
10 other provisions — procedural and definitional
s.001
Citation, commencement and revocation
s.002
Revocation
s.003
Interpretation
s.004
Electrical devices to which Part I applies
s.005
Prohibitions on supply etc. of electrical devices
s.006
Requirements for electrical devices
s.007
Appointment of notified bodies other than persons notified under the Low Voltage Directive
s.010
Electrical devices other than standard plugs
s.011
Appliances to which Part II applies
s.013
Information requirements
Schedules
Schedules
0 of 13 shown13 other schedules
s.sch001
Any plug, socket or adaptor which incorporates any other electrical...
s.sch001
Any plug or socket forming part of a ceiling–rose connector...
s.sch001
Any plug or socket forming part of a luminaire comprising...
s.sch001
Any non–UK plug supplied loose which is manufactured to comply...
s.sch001
Any non–rewirable or any moulded–on Europlug (that is to say...
s.sch001
Any travel adaptor (that is to say an adaptor which...
s.sch003
Any fixed luminaire, being a luminaire which cannot easily be...
s.sch003
Any ceiling–rose connector (that is to say a connector designed...
s.sch003
Any electric light designed and intended to be located within...
s.sch003
Any appliance which is fitted with an rcd plug.
s.sch003
Any appliance which is fitted with a plug transformer.
s.sch003
Any appliance which is fitted with a plug other than...
s.sch003
Any appliance which is intended to be permanently connected to...
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.