UK Statutory Instrument SI 1994/1331 United Kingdom

The Lydney and Parkend Light Railway (Extension and Amendment) Order 1994

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Trader8 Any Person1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Trader — also bound by 825 other Acts
Any Person — also bound by 2340 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art006 Gauge of railway and motive power Regulated
  • Operate new railways on standard gauge and approved motive powerTrader
s.art007 Conveyance of passengers Regulated
  • Obtain Secretary of State's permission before carrying passengers on new railways and comply with safety conditionsTrader
s.art009 Construction of public level crossing for Lydney Bypass Regulated
  • Provide protective equipment and comply with safety conditions at the bypass crossingTrader
s.art010 As to Parkend Crossing Regulated
  • Maintain level crossing gates and obtain County Council consent at Parkend crossingTrader
s.art012 For protection of Railtrack Regulated
  • Comply with Railtrack's reasonable requirements for safe operationTrader
7 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Incorporation and application of enactments
s.art004 Transfer of Railway
s.art005 Power to make railway
s.art008 Existing railway redefined
s.art011 For protection of public gas suppliers
Schedules

Schedules

4 of 56 shown
s.sch003 The gates shall be secured in the closed position on... Regulated
  • Phil's Refuse Collection and Recycling must not cause nuisance or harmAny Person
s.sch003 The Company shall give notice in writing to the Secretary... Regulated
  • Notify Secretary of State and arrange crossing inspectionTrader
s.sch004 Such gates shall be kept constantly closed and locked across... Regulated
  • Keep railway crossing gates closed and locked at all timesTrader
s.sch004 The Company shall erect and maintain at such point within... Regulated
  • Erect and maintain warning signs at the level crossingTrader
52 other schedules
s.sch003 A gate shall be pivoted as close to the railway...
s.sch003 A stop board of standard railway design displaying the words...
s.sch003 An advance warning board of standard railway design shall be...
s.sch003 A lifting barrier shall be pivoted as close to the...
s.sch003 When lowered the barriers shall be as nearly horizontal as...
s.sch003 When the barriers are fully lowered their uppermost surfaces shall...
s.sch003 When in the fully raised position the barriers shall be...
s.sch003 The barriers shall be as light as possible but shall...
s.sch003 The barriers shall display on both front and rear faces...
s.sch003 Suitable screening shall be provided for each barrier machine to...
s.sch003 Three electric lamps, each of not less than 5 watts...
s.sch003 When closed to road vehicles the gates shall extend across...
s.sch003 A traffic light signal as prescribed by regulation 31(4) of...
s.sch003 A lamp which when illuminated shows a symbol of the...
s.sch003 An audible warning device shall be provided on or adjacent...
s.sch003 A reflectorised stop line of the size, colour and type...
s.sch003 A reflectorised pedestrian stop line of the size, colour and...
s.sch003 Where the specified road passes over the crossing, reflectorised edge...
s.sch003 The right hand edge of each of the carriageways over...
s.sch003 A traffic sign of the size, colour and type shown...
s.sch003 A traffic sign of the size, colour and type shown...
s.sch003 A telephone mounted in a cabinet and connected to the...
s.sch003 The uppermost surfaces of the gates shall be not less...
s.sch003 Any lighting which is provided shall be at least to...
s.sch003 A train driver’s flashing red or flashing white indicator shall...
s.sch003 Facilities shall be provided at the crossing to operate the...
s.sch003 Two independent power supplies shall be provided at the crossing,...
s.sch003 A standard level crossing speed restriction board, which shall be...
s.sch003 An advance warning board of standard railway design shall be...
s.sch003 Cattle-cum-trespass guards of standard railway design shall be provided adjacent...
s.sch003 The surface of the accommodation road over the crossing shall...
s.sch003 The gates shall be kept constantly closed across the accommodation...
s.sch003 The gates shall open outwards away from the railway and,...
s.sch003 Drivers shall bring their trains to a halt at the...
s.sch003 The carriageway shall be divided into two separate carriageways approximately...
s.sch003 The barriers shall be kept in the fully raised position...
s.sch003 When a train either occupies a track circuit or operates...
s.sch003 Not less than 27 seconds shall elapse between the time...
s.sch003 The intermittent red lights shall continue to show and the...
s.sch003 After a train has passed one of the standard level...
s.sch003 In the event of failure of both intermittent red lights...
s.sch003 If either barrier fails to rise from the lowered position...
s.sch003 Should a total power failure occur, provided the barriers have...
s.sch003 Each gate shall be provided with a suitable mechanism at...
s.sch003 If the white train driver’s indicator mentioned in paragraph 31...
s.sch003 The gates shall be as light as possible but shall...
s.sch003 The framework of the gates shall be comprised of parallel...
s.sch003 The gates shall each display a semi-circular plate of Red...
s.sch003 A sign shall be provided approximately 5 metres before the...
s.sch004 Conditions and Requirements to be observed by the Company
s.sch004 The drivers or guards of trains passing along the Company’s...
s.sch004 Such gates shall be made conspicuous by being periodically painted...

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.