UK Statutory Instrument SI 1992/1113 United Kingdom

The Cholsey and Wallingford Light Railway (Extension and Amendment) Order 1992

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Any Person2 Operator1

Plus 1 duty on the regulator, Crown ministers and public bodies — folded into the section list below.

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Any Person — also bound by 2340 other Acts
Operator — also bound by 746 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art008 As to public liability insurance Regulated
  • Maintain public liability insurance of at least £2 million before operating the railwayAny Person
s.art010 Construction of public level crossing Regulated
  • Provide and maintain level crossing protective equipmentAny Person
11 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Incorporation and application of enactments: amendment of Order
s.art004 Power to make Railway
s.art005 Land required in connection with Railway No. 1 or Railway No. 2
s.art006 Gauge of railway and motive power
s.art007 Restriction of weight on rails and of speed: conveyance of passengers
s.art009 Existing railway redefined
s.art011 As to public footpath level crossings
s.art012 For protection of public gas suppliers
s.art013 For protection of Southern Electric plc
Schedules

Schedules

2 of 52 shown
s.sch003 The intermittent red lights shall continue to show and the... Regulated
  • Switch off level crossing warning lights and sounds before barriers reach 45°Operator
s.sch003 The Society shall give notice in writing to the Secretary... Regulated
Other duties (1) — Crown / regulator
  • Notify Secretary of State when crossing works are complete, then arrange inspectionCrown / Minister / Government department
50 other schedules
s.sch003 Particulars of the Gates, Traffic Signsand Other Protective Equipment at the AccommodationWork Stage.
s.sch003 A stop board of standard railway design displaying the words...
s.sch003 An advance warning board of standard railway design shall be...
s.sch003 Particulars of the Barriers and Other Protective Equipment when the Road is Open to the Public.
s.sch003 When lowered the barriers shall be as nearly horizontal as...
s.sch003 When the barriers are fully lowered their uppermost surfaces shall...
s.sch003 When in the fully raised position the barriers shall be...
s.sch003 The barriers shall be as light as possible but shall...
s.sch003 The barriers shall display on both front and rear faces...
s.sch003 Suitable screening shall be provided for each barrier machine to...
s.sch003 Three electric lamps, each of not less than 5 watts...
s.sch003 When closed to road vehicles the gates shall extend across...
s.sch003 A traffic light signal as prescribed by Regulation 31(4) of...
s.sch003 A lamp which when illuminated shows a symbol of the...
s.sch003 An audible warning device shall be provided on or adjacent...
s.sch003 A reflectorised stop line of the size, colour and type...
s.sch003 A reflectorised pedestrian stop line of the size, colour and...
s.sch003 Where the specified road passes over the crossing reflectorised edge...
s.sch003 The right hand edge of each of the carriageways over...
s.sch003 A traffic sign of the size, colour and type shown...
s.sch003 A traffic sign of the size, colour and type shown...
s.sch003 A telephone mounted in a cabinet and connected to the...
s.sch003 The uppermost surfaces of the gates shall be not less...
s.sch003 Any lighting which is provided shall be at least to...
s.sch003 A railway signal shall be provided on each railway approach...
s.sch003 Facilities shall be provided at the crossing to operate the...
s.sch003 Lighting shall be provided as necessary so that during the...
s.sch003 Two independent power supplies shall be provided at the crossing,...
s.sch003 A standard level crossing speed restriction board, which shall be...
s.sch003 An advance warning board of standard railway design shall be...
s.sch003 Cattle-cum-trespass guards of standard railway design shall be provided adjacent...
s.sch003 Conditions and Requirements to be observed by the Society at the Accommodation Work Stage.
s.sch003 The gates shall be kept constantly closed across the accommodation...
s.sch003 The gates shall open outwards away from the railway and,...
s.sch003 The gates shall be secured in the closed position on...
s.sch003 Drivers shall bring their trains to a halt at the...
s.sch003 Conditions and Requirements to be observed by the Society when the Road is Open to the Public.
s.sch003 The barriers shall be kept in the fully raised position...
s.sch003 When a train either occupies a track circuit or operates...
s.sch003 Not less than 27 seconds shall elapse between the time...
s.sch003 After a train has passed one of the standard level...
s.sch003 In the event of a failure of both intermittent red...
s.sch003 If either barrier fails to rise from the lowered position...
s.sch003 Each gate shall be provided with a suitable mechanism at...
s.sch003 Should a total power failure occur, provided the barriers have...
s.sch003 If the white railway signal mentioned in paragraph 31 above...
s.sch003 The gates shall be as light as possible but shall...
s.sch003 The framework of the gates shall be comprised of parallel...
s.sch003 The gates shall each display a semi-circular plate of Red...
s.sch003 A sign shall be provided approximately five metres before the...

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.