Scottish Statutory Instrument 2016 Scotland

The Reservoirs (Scotland) Regulations 2016

At a glance

Enforced by

SEPA

What's here

8 compliance obligations

Who this Act binds

Business-side actors with duties under this Act, ranked by how often they appear.

  • Operator 7

Plus 1 non-business duty on Crown ministers, regulators, local authorities or tribunals — shown collapsed under each section below.

Other Acts binding the same actors

For each actor bound by this Act, the other UK Acts that bind them most often. Useful for understanding the full compliance landscape facing each role.

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Part 1

Browse 1 other section in this Part — procedural / definitional / commencement
s.001

Citation, commencement and interpretation

Part 2

Browse 8 other sections in this Part — procedural / definitional / commencement
s.002

Lochs and other areas to be considered artificial or partly artificial

s.003

Calculation of volume of water that a structure or area is capable of holding

s.004

Calculation of volume of water that a structure or area is capable of releasing

s.005

Meaning of “natural level” and “surrounding land”

s.006

Structures or areas which are not controlled reservoirs

s.007

Weirs which are not capable of holding water above the...

s.008

(1) Road and railway embankments which are designed to drain...

s.009

A structure or area created as a result of the...

Part 3

s.011

Information that a reservoir manager must register with SEPA

  • Register reservoir information and documents with SEPA Operator
s.012

Time by which changes to information must be registered

  • Register changes to reservoir information with SEPA within 28 days Operator
s.013

Registration fees: general

  • Pay registration fee to SEPA for your controlled reservoir Operator
s.015

Annual subsistence fee: general

  • Pay annual subsistence fees to SEPA Operator
s.016

Annual subsistence fee: determination and charging

Other duties (1) — Crown / regulator
  • SEPA must determine and charge annual subsistence fees for controlled reservoirs Statutory regulator
s.017

Transfer fees: general

  • Pay transfer fee to SEPA when transferring reservoir management Operator
Browse 4 other sections in this Part — procedural / definitional / commencement
s.010

Controlled reservoirs register: additional information

s.014

Registration fees: determination and charging

s.018

Transfer fees: determination and charging

s.019

Charging schemes

Part 4

Browse 2 other sections in this Part — procedural / definitional / commencement
s.020

Applications for review of risk designations under section 23 of

s.021

Appeals to the Scottish Ministers following a review by SEPA of risk designation

Part 5

Browse 4 other sections in this Part — procedural / definitional / commencement
s.022

Applications for appointment: general

s.023

Applications for appointment: eligible persons

s.024

Fees in connection with applications for membership of panels

s.025

Applications for review of decisions to appoint or remove civil engineers from panels

Part 6

Browse 6 other sections in this Part — procedural / definitional / commencement
s.026

Notice of relevant works

s.027

Safety report

s.028

Safety measure certificate

s.029

Preliminary certificate

s.030

Construction certificate

s.031

Final certificates

Part 7

Browse 6 other sections in this Part — procedural / definitional / commencement
s.032

Notice of appointment of inspecting engineer

s.033

Inspection report

s.034

Inspection report: compliance certificates

s.035

Notice of appointment of supervising engineer

s.036

Statement by supervising engineer

s.037

Recording of water levels etc. and record keeping

Part 8

Browse 1 other section in this Part — procedural / definitional / commencement
s.038

Information about repairs

Part 9

s.042

Procedure before the referee

  • Respond to referee's invited statement and observations within 28/21 days Operator
Browse 4 other sections in this Part — procedural / definitional / commencement
s.039

Time within which a referee may be appointed by agreement

s.040

Time within which a request may be made for an appointment

s.041

Manner of the request for an appointment

s.043

Investigation and proceedings: expenses

Part 10

Browse 1 other section in this Part — procedural / definitional / commencement
s.044

Revocations

Schedules

s.sch001

To the extent known or readily obtainable by the reservoir...

  • Record details of engineers appointed to the reservoir Operator
Browse 57 other Schedules — structural / supplementary
s.sch001

The name (if any) and location of the reservoir.

s.sch001

For each part of a structure or area referred to...

s.sch001

The maximum volume of water capable of being held in...

s.sch001

The reservoir manager’s name, business address, email address and telephone...

s.sch001

If the reservoir manager is not an individual, the name...

s.sch001

The reservoir owner’s name, business address, email address and telephone...

s.sch001

To the extent known or readily obtainable by the reservoir...

s.sch001

Where applicable— (a) the date on which the reservoir was...

s.sch001

For each structure or area referred to in section 1(2)...

s.sch002

The applicant’s full name, date of birth, business address, email...

s.sch002

The 2011 Act panel(s) to which the applicant wishes to...

s.sch002

Where the application is for re-appointment to a 2011 Act...

s.sch002

The relevant qualifications of the applicant.

s.sch002

The applicant’s membership of professional institutions.

s.sch002

Details of the applicant’s present employment.

s.sch002

Details of— (a) all work carried out by the applicant...

s.sch003

The applicant’s full name, date of birth, business address, email...

s.sch003

The 2011 Act panel(s) to which the applicant wishes to...

s.sch003

The corresponding 1975 Act panel(s) which the applicant was a...

s.sch003

For each corresponding 1975 Act panel referred to in paragraph...

s.sch003

A statement, signed and dated by the applicant—

s.sch004

The applicant’s full name, date of birth, business address, email...

s.sch004

The decision to which the application relates including, as the...

s.sch004

The decision notice or letter and the date of that...

s.sch004

The grounds for appeal.

s.sch004

The relevant qualifications of the applicant.

s.sch004

The applicant’s membership of professional institutions.

s.sch004

Details of the applicant’s present employment.

s.sch004

Details of— (a) all work carried out by the applicant...

s.sch005

Details of the reservoir manager giving notice, including name, business...

s.sch005

The following information about the reservoir as it will be...

s.sch005

Signature and declaration certifying that the information given in the...

s.sch005

Contact details for correspondence, including name, business address, email address...

s.sch005

The name (if any) and location of the reservoir which...

s.sch005

The registration number (if any) for the reservoir in the...

s.sch005

The national grid reference for the approximate centre of the...

s.sch005

Whether the reservoir manager intends to undertake relevant work for...

s.sch005

The date on which it is intended that the proposed...

s.sch005

Details of the construction engineer appointed for the purposes of...

s.sch005

The date on which construction engineer was appointed.

s.sch016

Persons having, in relation to the reservoir, a function conferred...

s.sch016

Measures taken in the interests of safety or which might...

s.sch016

Details of notices, recommendations, directions and statements by a supervising...

s.sch016

Unusual events which could affect the safety of the reservoir....

s.sch016

Details of certificates, reports and directions given under the Act....

s.sch016

Appointment of any referee under the Act.

s.sch016

Drawing register.

s.sch016

Instrumentation at the reservoir.

s.sch016

Records of extent of opening of valves, gates and penstocks,...

s.sch016

Means of access to the reservoir.

s.sch016

Type of reservoir (e.g. whether impounding, non-impounding or service reservoir),...

s.sch016

Structural character of the dam(s), reservoir wall(s) or embankment(s), their...

s.sch016

Details of draw off works, bottom outlets, or any other...

s.sch016

Physical characteristics of direct and indirect catchment areas of the...

s.sch016

Standard average annual rainfall on direct and indirect catchment areas...

s.sch016

Spillway works, their type, location and level and the safety...

s.sch016

Details of relevant work notified to SEPA under section 33...

Official guidance

Authoritative sources published by regulators or government explaining this legislation.

Enforcement and responsible bodies

The regulators that administer or enforce this legislation.

Scottish Environment Protection Agency

Scotland's principal environmental regulator. Protects and improves Scotland's environment. Issues environmental permits for waste, emissions, water abstraction, and radioactive substances. Enforces environmental …

Explore more

Browse legislation

Find other UK business legislation with related guidance.

Regulators

Learn more about the bodies that enforce this legislation.