- Enforced by
- SEPA
- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Operator7
Plus 1 duty on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Operator — also bound by 746 other Acts
Regulation (EU) No 965/2012 (Air Operations)
203 duties
Space Industry Regulations 2021
76 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
Part 1
0 of 1 section shown
1 other section in this Part — procedural and definitional
s.001
Citation, commencement and interpretation
Part 2
0 of 8 sections shown
8 other sections in this Part — procedural and definitional
s.002
Lochs and other areas to be considered artificial or partly artificial
s.003
Calculation of volume of water that a structure or area is capable of holding
s.004
Calculation of volume of water that a structure or area is capable of releasing
s.005
Meaning of “natural level” and “surrounding land”
s.006
Structures or areas which are not controlled reservoirs
s.007
Weirs which are not capable of holding water above the...
s.008
(1) Road and railway embankments which are designed to drain...
s.009
A structure or area created as a result of the...
Part 3
6 of 10 sections shown
s.011
Information that a reservoir manager must register with SEPA
Regulated
- Register reservoir information and documents with SEPAOperator
s.012
Time by which changes to information must be registered
Regulated
- Register changes to reservoir information with SEPA within 28 daysOperator
s.013
Registration fees: general
Regulated
- Pay registration fee to SEPA for your controlled reservoirOperator
s.015
Annual subsistence fee: general
Regulated
- Pay annual subsistence fees to SEPAOperator
s.016
Annual subsistence fee: determination and charging
Regulated
Other duties (1) — Crown / regulator
- SEPA must determine and charge annual subsistence fees for controlled reservoirsStatutory regulator
s.017
Transfer fees: general
Regulated
- Pay transfer fee to SEPA when transferring reservoir managementOperator
4 other sections in this Part — procedural and definitional
s.010
Controlled reservoirs register: additional information
s.014
Registration fees: determination and charging
s.018
Transfer fees: determination and charging
s.019
Charging schemes
Part 4
0 of 2 sections shown
2 other sections in this Part — procedural and definitional
s.020
Applications for review of risk designations under section 23 of
s.021
Appeals to the Scottish Ministers following a review by SEPA of risk designation
Part 5
0 of 4 sections shown
4 other sections in this Part — procedural and definitional
s.022
Applications for appointment: general
s.023
Applications for appointment: eligible persons
s.024
Fees in connection with applications for membership of panels
s.025
Applications for review of decisions to appoint or remove civil engineers from panels
Part 6
0 of 6 sections shown
6 other sections in this Part — procedural and definitional
s.026
Notice of relevant works
s.027
Safety report
s.028
Safety measure certificate
s.029
Preliminary certificate
s.030
Construction certificate
s.031
Final certificates
Part 7
0 of 6 sections shown
6 other sections in this Part — procedural and definitional
s.032
Notice of appointment of inspecting engineer
s.033
Inspection report
s.034
Inspection report: compliance certificates
s.035
Notice of appointment of supervising engineer
s.036
Statement by supervising engineer
s.037
Recording of water levels etc. and record keeping
Part 8
0 of 1 section shown
1 other section in this Part — procedural and definitional
s.038
Information about repairs
Part 9
1 of 5 sections shown
s.042
Procedure before the referee
Regulated
- Respond to referee's invited statement and observations within 28/21 daysOperator
4 other sections in this Part — procedural and definitional
s.039
Time within which a referee may be appointed by agreement
s.040
Time within which a request may be made for an appointment
s.041
Manner of the request for an appointment
s.043
Investigation and proceedings: expenses
Part 10
0 of 1 section shown
1 other section in this Part — procedural and definitional
s.044
Revocations
Schedules
Schedules
1 of 58 shown
s.sch001
To the extent known or readily obtainable by the reservoir...
Regulated
- Record details of engineers appointed to the reservoirOperator
57 other schedules
s.sch001
The name (if any) and location of the reservoir.
s.sch001
For each part of a structure or area referred to...
s.sch001
The maximum volume of water capable of being held in...
s.sch001
The reservoir manager’s name, business address, email address and telephone...
s.sch001
If the reservoir manager is not an individual, the name...
s.sch001
The reservoir owner’s name, business address, email address and telephone...
s.sch001
To the extent known or readily obtainable by the reservoir...
s.sch001
Where applicable— (a) the date on which the reservoir was...
s.sch001
For each structure or area referred to in section 1(2)...
s.sch002
The applicant’s full name, date of birth, business address, email...
s.sch002
The 2011 Act panel(s) to which the applicant wishes to...
s.sch002
Where the application is for re-appointment to a 2011 Act...
s.sch002
The relevant qualifications of the applicant.
s.sch002
The applicant’s membership of professional institutions.
s.sch002
Details of the applicant’s present employment.
s.sch002
Details of— (a) all work carried out by the applicant...
s.sch003
The applicant’s full name, date of birth, business address, email...
s.sch003
The 2011 Act panel(s) to which the applicant wishes to...
s.sch003
The corresponding 1975 Act panel(s) which the applicant was a...
s.sch003
For each corresponding 1975 Act panel referred to in paragraph...
s.sch003
A statement, signed and dated by the applicant—
s.sch004
The applicant’s full name, date of birth, business address, email...
s.sch004
The decision to which the application relates including, as the...
s.sch004
The decision notice or letter and the date of that...
s.sch004
The grounds for appeal.
s.sch004
The relevant qualifications of the applicant.
s.sch004
The applicant’s membership of professional institutions.
s.sch004
Details of the applicant’s present employment.
s.sch004
Details of— (a) all work carried out by the applicant...
s.sch005
Details of the reservoir manager giving notice, including name, business...
s.sch005
The following information about the reservoir as it will be...
s.sch005
Signature and declaration certifying that the information given in the...
s.sch005
Contact details for correspondence, including name, business address, email address...
s.sch005
The name (if any) and location of the reservoir which...
s.sch005
The registration number (if any) for the reservoir in the...
s.sch005
The national grid reference for the approximate centre of the...
s.sch005
Whether the reservoir manager intends to undertake relevant work for...
s.sch005
The date on which it is intended that the proposed...
s.sch005
Details of the construction engineer appointed for the purposes of...
s.sch005
The date on which construction engineer was appointed.
s.sch016
Persons having, in relation to the reservoir, a function conferred...
s.sch016
Measures taken in the interests of safety or which might...
s.sch016
Details of notices, recommendations, directions and statements by a supervising...
s.sch016
Unusual events which could affect the safety of the reservoir....
s.sch016
Details of certificates, reports and directions given under the Act....
s.sch016
Appointment of any referee under the Act.
s.sch016
Drawing register.
s.sch016
Instrumentation at the reservoir.
s.sch016
Records of extent of opening of valves, gates and penstocks,...
s.sch016
Means of access to the reservoir.
s.sch016
Type of reservoir (e.g. whether impounding, non-impounding or service reservoir),...
s.sch016
Structural character of the dam(s), reservoir wall(s) or embankment(s), their...
s.sch016
Details of draw off works, bottom outlets, or any other...
s.sch016
Physical characteristics of direct and indirect catchment areas of the...
s.sch016
Standard average annual rainfall on direct and indirect catchment areas...
s.sch016
Spillway works, their type, location and level and the safety...
s.sch016
Details of relevant work notified to SEPA under section 33...
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.