- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Operator12
Plus 1 duty on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Operator — also bound by 746 other Acts
Regulation (EU) No 965/2012 (Air Operations)
203 duties
Space Industry Regulations 2021
76 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
s.004
General application
Regulated
- Obtain planning permission before operating an extractive waste area or facilityOperator
s.005
Transitional provisions
Regulated
- Get waste management plan approved by planning authority by 30 April 2012Operator
s.011
Waste management plan
Regulated
- Submit a compliant waste management plan with your planning applicationOperator
s.016
Review and update of waste management plan
Regulated
- Review and update your waste management plan every 5 yearsOperator
s.017
Review and update of planning permission
Regulated
- Notify planning authority of substantial changes to waste facilityOperator
s.018
Major-accident prevention policy, safety management system and internal emergency plan
Regulated
- Prepare major-accident prevention policy and emergency plan for Category A waste facilityOperator
s.019
External emergency plan
Regulated
- Provide information to help SEPA prepare an external emergency planOperator
s.020
Public consultation and public information
Regulated
- Provide emergency safety information to the public and involve them in emergency plan reviewsOperator
s.022
Construction and management: duties of operator
Regulated
- Manage extractive waste facility to meet all construction and operational requirementsOperator
s.023
Prevention of water status deterioration, air and soil pollution
Regulated
- Prevent water, air and soil pollution from extractive waste facilitiesOperator
s.024
Construction and management: inspection by the planning authority
Regulated
Other duties (1) — Crown / regulator
- Planning authority must inspect extractive waste facilities annuallyLocal authority
s.025
Closure procedures: duties of operator
Regulated
- Do not close a waste facility without meeting planning conditions or obtaining authorisationOperator
s.027
After‑closure procedures: duties of operator
Regulated
- Maintain, monitor and manage closed waste facility to planning authority requirementsOperator
21 other provisions — procedural and definitional
sch. 3 para. 1
sch. 3 para. 1
sch. 3 para. 4
sch. 3 para. 4
s.001
Citation and commencement
s.002
Interpretation
s.003
Consequential amendment of subordinate legislation
s.006
Extractive waste area
s.007
Inert waste, unpolluted soil and peat-related waste
s.008
Non‑hazardous prospecting waste, unpolluted soil and peat-related waste
s.009
Non‑hazardous non-inert waste
s.010
Applications for planning permission
s.012
Consultations before consideration of applications
s.013
Decision by planning authority
s.014
Mandatory conditions: general
s.015
Financial guarantee
s.021
Co-operation with other member States
s.026
Closure and after-closure procedures: duties of planning authority
s.028
Inventory of closed waste facilities
s.029
Appeals
s.030
Enforcement
s.031
Compensation
s.032
Electronic communications
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.