Retained EU Law SI 2002/735 United Kingdom

Commission Decision of 30 May 2002 concerning the technical specification for interoperability relating to the rolling stock subsystem of the trans-European high-speed rail system referred to in Article 6(1) of Directive 96/48/EC (notified under document number C(2002) 1952) (Text with EEA relevance) (2002/735/EC)

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Manufacturer11

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Manufacturer — also bound by 502 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

uri:annex/annex/f/division/module uri:annex/annex/f/division/module Regulated
  • Declare conformity of high-speed rail components and keep technical recordsManufacturer
uri:annex/annex/f/division/module/division/10 uri:annex/annex/f/division/module/division/10 Regulated
  • Keep EC type-examination certificates for 10 years after last productManufacturer
uri:annex/annex/f/division/module/division/11 uri:annex/annex/f/division/module/division/11 Regulated
  • Keep product suitability certificates for 10 years after last productionManufacturer
uri:annex/annex/f/division/module/division/12 uri:annex/annex/f/division/module/division/12 Regulated
  • Draw up EC declaration of suitability for interoperability constituentsManufacturer
uri:annex/annex/f/division/module/division/13 uri:annex/annex/f/division/module/division/13 Regulated
  • Keep EC declaration of suitability for use for 10 yearsManufacturer
uri:annex/annex/f/division/module/division/2 uri:annex/annex/f/division/module/division/2 Regulated
  • Prepare technical documentation for high-speed rail rolling stockManufacturer
uri:annex/annex/f/division/module/division/4 uri:annex/annex/f/division/module/division/4 Regulated
  • Ensure manufacturing process matches technical specificationsManufacturer
uri:annex/annex/f/division/module/division/6 uri:annex/annex/f/division/module/division/6 Regulated
  • Keep EC declaration of conformity and technical docs for 10 yearsManufacturer
uri:annex/division/6/division/6.1/division/6.1.1 uri:annex/division/6/division/6.1/division/6.1.1 Regulated
  • Obtain EC declaration of conformity/suitability for railway interoperability constituents before placing on marketManufacturer
uri:annex/division/6/division/6.1/division/6.1.2/division/6.1.2.1 uri:annex/division/6/division/6.1/division/6.1.2/division/6.1.2.1 Regulated
  • Apply specified conformity assessment procedures for high-speed rail interoperability constituentsManufacturer
uri:annex/division/6/division/6.1/division/6.1.2/division/6.1.2.2 uri:annex/division/6/division/6.1/division/6.1.2/division/6.1.2.2 Regulated
  • Use Module V type validation for specified high-speed rail rolling stock componentsManufacturer
32 other provisions — procedural and definitional
uri:annex/annex/f/division/module/division/3 uri:annex/annex/f/division/module/division/3
uri:annex/annex/f/division/module/division/5 uri:annex/annex/f/division/module/division/5
uri:annex/annex/f/division/module/division/7 uri:annex/annex/f/division/module/division/7
uri:annex/annex/f/division/module/division/8 uri:annex/annex/f/division/module/division/8
uri:annex/annex/f/division/module/division/9 uri:annex/annex/f/division/module/division/9
uri:annex/division/6/division/6.1/division/6.1.2/division/6.1.2.3 uri:annex/division/6/division/6.1/division/6.1.2/division/6.1.2.3
uri:annex/division/6/division/6.2/division/6.2.1 uri:annex/division/6/division/6.2/division/6.2.1
uri:annex/division/6/division/6.2/division/6.2.2 uri:annex/division/6/division/6.2/division/6.2.2
uri:annex/division/7/division/7.3/division/7.3.6 uri:annex/division/7/division/7.3/division/7.3.6
s.annex/annex/a/paragraph/1 Detailed description of the passive safety provisions covered in Section...
s.annex/annex/b/paragraph/1 A significant number of tunnels (both twin and single track)...
s.annex/annex/b/paragraph/10 Take these values at 250 km/h
s.annex/annex/b/paragraph/11 ΔP0 < or = 1 800 Pa, ΔP1 < or...
s.annex/annex/b/paragraph/12 These values are given by a blocking ratio between the...
s.annex/annex/b/paragraph/2 When a train enters a tunnel, pressure waves are created...
s.annex/annex/b/paragraph/3 The extent of the phenomenon depends on a number of...
s.annex/annex/b/paragraph/4 the ratio between the train and tunnel cross-sections, the shape...
s.annex/annex/b/paragraph/5 The aerodynamic characteristics of a trainset vis-à-vis the generation of...
s.annex/annex/b/paragraph/6 The train can be defined by an envelope curve signature...
s.annex/annex/b/paragraph/7 annex/annex/B/paragraph/7
s.annex/annex/b/paragraph/8 Pressure variation at a point within the tunnel.
s.annex/annex/b/paragraph/9 Envelope curve unique to the trainset.
s.annex/annex/i/paragraph/1 The data to be provided for the register provided for...
s.annex/annex/m/paragraph/1 annex/annex/M/paragraph/1
s.annex/annex/p/paragraph/1 The characteristics of the main traction voltage systems (with the...
s.annex/annex/p/paragraph/2 The voltage of the collection bar in the substation including...
s.art001 The TSI relating to the ‘rolling stock’ subsystem of the...
s.art002 (1) With regard to the aspects that are common to...
s.art003 (1) For the purposes of this Article: ‘upgrading’ means major...
s.art004 The relevant parts of Commission recommendation 2001/290/EC on the basic...
s.art005 The attached TSI shall enter into force six months after...
s.art006 This Decision is addressed to the Member States.

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.