- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Manufacturer17
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Manufacturer — also bound by 502 other Acts
Measuring Instruments Regulations 2016
85 duties
Human Medicines Regulations 2012
75 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
uri:annex/appendix/6/division/1/division/1
uri:annex/appendix/6/division/1/division/1
Regulated
- Propose alternative torque-check method if maximum curve unreachableManufacturer
uri:annex/appendix/7/division/1/division/2/division/2.3
uri:annex/appendix/7/division/1/division/2/division/2.3
Regulated
- State the communication standard used for engine data accessManufacturer
uri:annex/division/10/division/10.1
uri:annex/division/10/division/10.1
Regulated
- Draft test report for each engine tested using PEMSManufacturer
uri:annex/division/10/division/10.2
uri:annex/division/10/division/10.2
Regulated
- Keep instantaneous emissions data for 10 years and share it on requestManufacturer
uri:annex/division/10/division/10.3
uri:annex/division/10/division/10.3
Regulated
- Provide separate report with in-service emission data for non-road enginesManufacturer
uri:annex/division/2/division/2.1
uri:annex/division/2/division/2.1
Regulated
- Submit initial in-service engine monitoring plan within 1 month of production startManufacturer
uri:annex/division/2/division/2.3
uri:annex/division/2/division/2.3
Regulated
- Submit updated in-service engine monitoring plan to approval authorityManufacturer
uri:annex/division/2/division/2.6/division/2.6.1
uri:annex/division/2/division/2.6/division/2.6.1
Regulated
- Test in-service engines and submit results by deadlinesManufacturer
uri:annex/division/2/division/2.6/division/2.6.2/division/2.6.2.2
uri:annex/division/2/division/2.6/division/2.6.2/division/2.6.2.2
Regulated
- Submit test results after first engine installation if no engines installed for 18 monthsManufacturer
uri:annex/division/2/division/2.6/division/2.6.2/division/2.6.2.3
uri:annex/division/2/division/2.6/division/2.6.2/division/2.6.2.3
Regulated
- Submit reduced engine test results if you are a small-volume manufacturerManufacturer
uri:annex/division/3/division/3.1
uri:annex/division/3/division/3.1
Regulated
- Demonstrate operator competence for in-service emission testsManufacturer
uri:annex/division/3/division/3.2
uri:annex/division/3/division/3.2
Regulated
- Ensure emission tests reflect real-world operating conditionsManufacturer
uri:annex/division/3/division/3.4
uri:annex/division/3/division/3.4
Regulated
- Take and retain samples of lubricating oil, fuel and reagent for 12 monthsManufacturer
uri:annex/division/5/division/5.2
uri:annex/division/5/division/5.2
Regulated
- Verify ECU signals and check torque conformity during PEMS testingManufacturer
uri:annex/division/6
uri:annex/division/6
Regulated
- Conduct in-service emissions tests on non-road mobile machinery using PEMSManufacturer
uri:annex/division/7
uri:annex/division/7
Regulated
- Retain entire test data for 10 years and do not modify or remove itManufacturer
uri:annex/division/8
uri:annex/division/8
Regulated
- Follow Appendix 5 procedures for PEMS emission calculationsManufacturer
7 other provisions — procedural and definitional
uri:annex/appendix/7/division/1/division/2/division/2.1
uri:annex/appendix/7/division/1/division/2/division/2.1
uri:annex/division/2/division/2.5
uri:annex/division/2/division/2.5
s.art001
Subject matter
s.art002
Scope
s.art003
Procedures and requirements for monitoring of emissions of in-service engines
s.art003
Transitional provisions
s.art004
Entry into force
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.