Retained EU Law SI 2017/2196 United Kingdom

Commission Regulation (EU) 2017/2196 of 24 November 2017 establishing a network code on electricity emergency and restoration (Text with EEA relevance)

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Operator7 Any Person3

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Operator — also bound by 746 other Acts
Any Person — also bound by 2340 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art012 Implementation of the system defence plan Regulated
  • Implement system defence measures within 12 months of notificationOperator
s.art018 Frequency deviation management procedure Regulated
  • Follow TSO instructions for frequency deviation managementOperator
s.art019 Voltage deviation management procedure Regulated
  • Transmission system operators must manage voltage within secure limitsOperator
s.art020 Power flow management procedure Regulated
  • Follow TSO instructions to manage power flows during emergencyOperator
s.art021 Assistance for active power procedure Regulated
  • Respond to TSO request for active power assistanceOperator
s.art035 Procedure for suspension of market activities Regulated
  • Operate at active power set-point during market suspensionAny Person
s.art040 Information exchange Regulated
  • Exchange information during electricity emergency, blackout or restoration statesAny Person
s.art042 Tools and facilities Regulated
  • Ensure critical tools, facilities, and backup control for electricity restorationOperator
s.art045 Compliance testing of demand facilities providing demand side response Regulated
  • Run mandatory demand response tests after failures or annuallyOperator
s.art054 Amendments to contracts and general terms and conditions Regulated
  • Amend contracts and terms to comply with electricity emergency regulationAny Person
46 other provisions — procedural and definitional
s.annex para.1 Automatic low frequency demand disconnection scheme characteristics:
s.art001 Subject matter
s.art002 Scope
s.art003 Definitions
s.art004 Regulatory aspects
s.art005 Consultation and coordination
s.art006 Regional coordination
s.art007 Public consultation
s.art008 Recovery of costs
s.art009 Confidentiality obligations
s.art010 Agreement with TSOs not bound by this Regulation
s.art011 Design of the system defence plan
s.art013 Activation of the system defence plan
s.art014 Inter-TSO assistance and coordination in emergency state
s.art015 Automatic under-frequency control scheme
s.art016 Automatic over-frequency control scheme
s.art017 Automatic scheme against voltage collapse
s.art022 Manual demand disconnection procedure
s.art023 Design of the restoration plan
s.art024 Implementation of the restoration plan
s.art025 Activation of the restoration plan
s.art026 Re-energisation procedure
s.art027 Activation of the re-energisation procedure
s.art028 Frequency management procedure
s.art029 Appointment of a frequency leader
s.art030 Frequency management after frequency deviation
s.art031 Frequency management after synchronous area split
s.art032 Resynchronisation procedure
s.art033 Appointment of a resynchronisation leader
s.art034 Resynchronisation strategy
s.art036 Rules for suspension and restoration of market activities
s.art037 Procedure for restoration of market activities
s.art038 Communication procedure
s.art039 Rules for settlement in case of suspension of market activities
s.art041 Communication systems
s.art043 General principles
s.art044 Compliance testing of power generating module capabilities
s.art046 Compliance testing of HVDC capabilities
s.art047 Compliance testing of low frequency demand disconnection relays
s.art048 Testing of communication systems
s.art049 Testing of tools and facilities
s.art050 Compliance testing and periodic review of the system defence plan
s.art051 Compliance testing and periodic review of the restoration plan
s.art052 Monitoring
s.art053 Stakeholder involvement
s.art055 Entry into force

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.