- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Any Person8
Operator2
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Any Person — also bound by 2340 other Acts
Human Medicines Regulations 2012
184 duties
Merchant Shipping Act 1995
144 duties
Insolvency (England and Wales) Rules 2016
104 duties
Communications Act 2003
92 duties
Road Traffic Act 1988
92 duties
Operator — also bound by 746 other Acts
Regulation (EU) No 965/2012 (Air Operations)
203 duties
Space Industry Regulations 2021
76 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
s.art024
Availability of TSO's means, tools and facilities
Regulated
- TSO must ensure availability and reliability of key tools and facilitiesAny Person
s.art028
Obligations of SGUs concerning voltage control and reactive power management in system operation
Regulated
- Manage voltage control and reactive power in line with TSO requirementsAny Person
s.art039
Dynamic stability management
Regulated
- Manage dynamic stability of the transmission systemOperator
s.art040
Organisation, roles, responsibilities and quality of data exchange
Regulated
- Agree and publish data exchange roles and quality standardsAny Person
s.art045
Structural data exchange
Regulated
- Provide structural data to the Transmission System OperatorAny Person
s.art046
Scheduled data exchange
Regulated
- Provide scheduled operational data to the Transmission System OperatorOperator
s.art047
Real-time data exchange
Regulated
- Provide real-time data to the transmission system operatorAny Person
s.art053
Data exchange between TSOs and distribution-connected demand facilities or third parties participating in demand response
Regulated
- Provide scheduled and real-time data to the TSO and DSO for demand responseAny Person
s.art054
Responsibility of the SGUs
Regulated
- Notify TSO/DSO of changes, disturbances, test schedules and comply with testing requestsAny Person
s.art191
Amendments to contracts and general terms and conditions
Regulated
- Ensure contracts and general terms comply with system operation regulationAny Person
188 other provisions — procedural and definitional
s.annex iii para.1
Frequency quality defining parameters referred to in Article 127:
s.annex iii para.2
Frequency quality target parameters referred to in Article 127:
s.annex ii para.1
Voltage ranges referred to in Article 27:
s.annex iv para.1
FRCE target parameters referred to in Article 128:
s.annex vi para.1
Limits and requirements for the exchange of FCR referred to...
s.annex v para.1
FCR technical minimum requirements referred to in Article 154:
s.art001
Subject matter
s.art002
Scope
s.art003
Definitions
s.art004
Objectives and regulatory aspects
s.art005
Terms and conditions or methodologies of TSOs
s.art006
Approval of terms and conditions or methodologies of TSOs
s.art007
Amendments to the terms and conditions or methodologies of TSOs
s.art008
Publication on internet
s.art009
Recovery of costs
s.art010
Stakeholder involvement
s.art011
Public consultation
s.art012
Confidentiality obligations
s.art013
Agreements with TSOs not bound by this Regulation
s.art014
Monitoring
s.art015
Annual report on operational security indicators
s.art016
Annual report on load-frequency control
s.art017
Annual report on regional coordination assessment
s.art018
Classification of system states
s.art019
Monitoring and determination of system states by TSOs
s.art020
Remedial actions in system operation
s.art021
Principles and criteria applicable to remedial actions
s.art022
Categories of remedial actions
s.art023
Preparation, activation and coordination of remedial actions
s.art025
Operational security limits
s.art026
Security plan for critical infrastructure protection
s.art027
Obligations of all TSOs regarding voltage limits
s.art029
Obligations of all TSOs concerning voltage control and reactive power management in system operation
s.art030
Short-circuit current
s.art031
Short-circuit current calculation and related measures
s.art032
Power flow limits
s.art033
Contingency lists
s.art034
Contingency analysis
s.art035
Contingency handling
s.art036
General requirements on protection
s.art037
Special protection schemes
s.art038
Dynamic stability monitoring and assessment
s.art041
Structural and forecast data exchange
s.art042
Real-time data exchange
s.art043
Structural data exchange
s.art044
Real-time data exchange
s.art048
Structural data exchange
s.art049
Scheduled data exchange
s.art050
Real-time data exchange
s.art051
Data exchange between TSOs and DSOs concerning significant power generating modules
s.art052
Data exchange between TSOs and transmission-connected demand facilities
s.art055
Tasks of TSOs regarding system operation
s.art056
Purpose and responsibilities
s.art057
Performing operational tests and analysis
s.art058
Training program
s.art059
Training conditions
s.art060
Training coordinators and trainers
s.art061
Certification of system operator employees in charge of real-time operation
s.art062
Common language for communication between the system operator employees in charge of real time operation
s.art063
Cooperation between TSOs on training
s.art064
General provisions regarding individual and common grid models
s.art065
Year-ahead scenarios
s.art066
Year-ahead individual grid models
s.art067
Year-ahead common grid models
s.art068
Updates of year-ahead individual and common grid models
s.art069
Week-ahead individual and common grid models
s.art070
Methodology for building day-ahead and intraday common grid models
s.art071
Quality control for grid models
s.art072
Operational security analysis in operational planning
s.art073
Year-ahead up to and including week-ahead operational security analysis
s.art074
Day-ahead, intraday and close to real-time operational security analysis
s.art075
Methodology for coordinating operational security analysis
s.art076
Proposal for regional operational security coordination
s.art077
Organisation for regional operational security coordination
s.art078
Regional operational security coordination
s.art079
Common grid model building
s.art080
Regional outage coordination
s.art081
Regional adequacy assessment
s.art082
Outage coordination objective
s.art083
Regional coordination
s.art084
Methodology for assessing the relevance of assets for outage coordination
s.art085
Lists of relevant power generating modules and relevant demand facilities
s.art086
Update of the lists of relevant power generating modules and relevant demand facilities
s.art087
Lists of relevant grid elements
s.art088
Update of the list of relevant grid elements
s.art089
Appointment of outage planning agents
s.art090
Treatment of relevant assets located in a distribution system or in a closed distribution system
s.art091
Variations to deadlines for the year-ahead outage coordination
s.art092
General provisions on availability plans
s.art093
Long-term indicative availability plans
s.art094
Provision of year-ahead availability plan proposals
s.art095
Year-ahead coordination of the availability status of relevant assets for which the outage planning agent is not a TSO taking part in an outage coordination region, nor a DSO or a CDSO
s.art096
Year-ahead coordination of the availability status of relevant assets for which the outage planning agent is a TSO taking part in an outage coordination region, a DSO or a CDSO
s.art097
Provision of preliminary year-ahead availability plans
s.art098
Validation of year-ahead availability plans within outage coordination regions
s.art099
Final year-ahead availability plans
s.art100
Updates to the final year-ahead availability plans
s.art101
Management of the ‘testing’ status of relevant assets
s.art102
Procedure for handling forced outages
s.art103
Real-time execution of the availability plans
s.art104
Forecast for control area adequacy analysis
s.art105
Control area adequacy analysis
s.art106
Control area adequacy ...
s.art107
Control area adequacy in day-ahead and intraday
s.art108
Ancillary services
s.art109
Reactive power ancillary services
s.art110
Establishment of scheduling processes
s.art111
Notification of schedules within scheduling areas
s.art112
Coherence of schedules
s.art113
Provision of information to other TSOs
s.art114
General provisions for ENTSO for Electricity operational planning data environment
s.art115
Individual grid models, common grid models and operational security analysis
s.art116
Outage coordination
s.art117
System adequacy
s.art118
Synchronous area operational agreements
s.art119
LFC block operational agreements
s.art120
LFC area operational agreement
s.art121
Monitoring area operational agreement
s.art122
Imbalance netting agreement
s.art123
Cross-border FRR activation agreement
s.art124
Cross-border RR activation agreement
s.art125
Sharing agreement
s.art126
Exchange agreement
s.art127
Frequency quality defining and target parameters
s.art128
FRCE target parameters
s.art129
Criteria application process
s.art130
Frequency quality evaluation data
s.art131
Frequency quality evaluation criteria
s.art132
Data collection and delivery process
s.art133
Synchronous area monitor
s.art134
LFC block monitor
s.art135
Information on load and generation behaviour
s.art136
Ramping period within the synchronous area
s.art137
Ramping restrictions for active power output
s.art138
Mitigation
s.art139
Basic structure
s.art140
Process activation structure
s.art141
Process responsibility structure
s.art142
Frequency containment process
s.art143
Frequency restoration process
s.art144
Reserve replacement process
s.art145
Automatic and manual frequency restoration process
s.art146
Imbalance netting process
s.art147
Cross-border FRR activation process
s.art148
Cross-border RR activation process
s.art149
General requirements for cross-border control processes
s.art150
TSO notification
s.art151
Infrastructure
s.art152
System states related to system frequency
s.art153
FCR dimensioning
s.art154
FCR technical minimum requirements
s.art155
FCR prequalification process
s.art156
FCR provision
s.art157
FRR dimensioning
s.art158
FRR minimum technical requirements
s.art159
FRR prequalification process
s.art160
RR dimensioning
s.art161
RR minimum technical requirements
s.art162
RR prequalification process
s.art163
Exchange of FCR within a synchronous area
s.art164
Sharing of FCR within a synchronous area
s.art165
General requirements for the exchange of FRR and RR within a synchronous area
s.art166
General requirements for sharing FRR and RR within a synchronous area
s.art167
Exchange of FRR within a synchronous area
s.art168
Sharing of FRR within a synchronous area
s.art169
Exchange of RR within a synchronous area
s.art170
Sharing of RR within a synchronous area
s.art171
General requirements
s.art172
Frequency coupling between synchronous areas
s.art173
Exchange of FCR between synchronous areas
s.art174
Sharing of FCR between synchronous areas
s.art175
General requirements for sharing of FRR and RR between synchronous areas
s.art176
Exchange of FRR between synchronous areas
s.art177
Sharing of FRR between synchronous areas
s.art178
Exchange of RR between synchronous areas
s.art179
Sharing of RR between synchronous areas
s.art180
Cross-border activation process for FRR/RR
s.art181
Time control process
s.art182
Reserve providing groups or units connected to the DSO grid
s.art183
General transparency requirements
s.art184
Information on operational agreements
s.art185
Information on frequency quality
s.art186
Information on the load-frequency control structure
s.art187
Information on FCR
s.art188
Information on FRR
s.art189
Information on RR
s.art190
Information on sharing and exchange
s.art192
Entry into force
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.