Retained EU Law 2016 United Kingdom

Commission Regulation (EU) 2016/1447 of 26 August 2016 establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules (Text with EEA relevance)

At a glance

What's here

16 compliance obligations

Who this Act binds

Plus 1 non-business duty on Crown ministers, regulators, local authorities or tribunals — shown collapsed under each section below.

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

s.art004

Application to existing HVDC systems and DC-connected power park modules

  • Notify system operator before upgrading HVDC equipment
s.art039

Frequency stability requirements

  • Your DC-connected power park must meet fast frequency response signal processing requirements
s.art040

Reactive power and voltage requirements

  • Ensure your DC-connected power park module meets voltage and reactive power requirements
s.art041

Control requirements

  • Limit voltage changes when synchronising DC-connected power park modules to the AC network
s.art047

Frequency stability requirements

  • Agree technical communication modalities for frequency response with remote-end station owner
s.art060

General provisions

  • Complete operational notification for new DC-connected power park modules
s.art062

ION for DC-connected power park modules

  • Provide technical data and studies to obtain interim operational notification
s.art063

FON for DC-connected power park modules

  • Provide compliance statement and technical data updates when requested by the system operator
s.art064

Limited operational notification for DC-connected power park modules

  • Inform system operator of capability loss or non-compliance and apply for LON
s.art066

Principles of cost-benefit analysis

  • Assist in cost-benefit analyses and follow prescribed methodology when performing your own
s.art067

Common provisions for compliance testing

  • Test your HVDC system or power park to prove compliance
s.art068

Common provisions on compliance simulation

  • Provide simulation report and validated model for HVDC system or DC-connected power park module
s.art069

Responsibility of the HVDC system owner and DC-connected power park module owner

  • Ensure ongoing compliance and notify the system operator of changes, incidents, and tests
s.art070

Tasks of the relevant system operator

Other duties (1) — Crown / regulator
  • System operator must assess HVDC compliance and publish requirements Statutory regulator
s.art074

Compliance simulations for DC-connected power park modules and remote-end HVDC converter units

  • Run compliance simulations for grid connection of HVDC systems and power park modules
s.art079

Request for derogations by an HVDC system owner or DC-connected power park module owner

  • Submit a derogation request to your system operator with all required details
Browse 85 other sections — procedural / definitional / commencement
s.annex iii para.1

Synchronous Area Voltage Range Time period for operation . ....

s.annex iii para.2

Synchronous Area Voltage Range Time period for operation . ....

s.annex i para.1

Table 1: Minimum time periods an HVDC system shall be...

s.annex iv para.1

Figure 5: The diagram represents boundaries of a U-Q/Pmax-profile with...

s.annex iv para.2

Table 6: Parameters for the Inner Envelope in the Figure....

s.annex viii para.1

Voltage range Time period for operation 0.85 pu-0.90 pu 60...

s.annex viii para.2

Voltage range Time period for operation 0.85 pu-0.90 pu 60...

s.annex viii para.3

Maximum range of Q/Pmax Maximum range of steady-state voltage level...

s.annex vii para.1

Voltage Range Time period for operation 0.85 pu-0.90 pu 60...

s.annex vii para.2

Voltage Range Time period for operation 0.85 pu-0.90 pu 60...

s.annex vii para.3

Figure 7: U-Q/Pmax-profile of a DC-connected power park module at...

s.annex vii para.4

Range of width of Q/Pmax profile Range of steady-state Voltage...

s.annex vi para.1

Frequency range Time period for operation 47.0 Hz-47.5 Hz 20...

s.annex v para.1

Figure 6: Fault-ride-through profile of an HVDC converter station. The...

s.annex v para.2

Voltage parameters [pu] Time parameters [seconds] Uret 0.00-0.30 tclear 0.14-0.25...

s.art001

Subject matter

s.art002

Definitions

s.art003

Scope of application

s.art005

Regulatory aspects

s.art006

Multiple TSOs

s.art007

Recovery of costs

s.art008

Public consultation

s.art009

Stakeholder involvement

s.art010

Confidentiality obligations

s.art011

Frequency ranges

s.art012

Rate-of-change-of-frequency withstand capability

s.art013

Active power controllability, control range and ramping rate

s.art014

Synthetic inertia

s.art015

Requirements relating to frequency sensitive mode, limited frequency sensitive mode overfrequency and limited frequency sensitive mode underfrequency

s.art016

Frequency control

s.art017

Maximum loss of active power

s.art018

Voltage ranges

s.art019

Short circuit contribution during faults

s.art020

Reactive power capability

s.art021

Reactive power exchanged with the network

s.art022

Reactive power control mode

s.art023

Priority to active or reactive power contribution

s.art024

Power quality

s.art025

Fault ride through capability

s.art026

Post fault active power recovery

s.art027

Fast recovery from DC faults

s.art028

Energisation and synchronisation of HVDC converter stations

s.art029

Interaction between HVDC systems or other plants and equipment

s.art030

Power oscillation damping capability

s.art031

Subsynchronous torsional interaction damping capability

s.art032

Network characteristics

s.art033

HVDC system robustness

s.art034

Electrical protection schemes and settings

s.art035

Priority ranking of protection and control

s.art036

Changes to protection and control schemes and settings

s.art037

Black start

s.art038

Scope

s.art042

Network characteristics

s.art043

Protection requirements

s.art044

Power quality

s.art045

General system management requirements applicable to DC-connected power park modules

s.art046

Scope

s.art048

Reactive power and voltage requirements

s.art049

Network characteristics

s.art050

Power quality

s.art051

Operation of HVDC systems

s.art052

Parameters and settings

s.art053

Fault recording and monitoring

s.art054

Simulation models

s.art055

General provisions

s.art056

EON for HVDC systems

s.art057

ION for HVDC systems

s.art058

FON for HVDC systems

s.art059

Limited operational notification for HVDC systems/derogations

s.art061

EON for DC-connected power park modules

s.art065

Identification of costs and benefits of application of requirements to existing HVDC systems or DC-connected power park modules

s.art071

Compliance testing for HVDC systems

s.art072

Compliance testing for DC-connected power park modules and remote-end HVDC converter units

s.art073

Compliance simulations for HVDC systems

s.art075

Non-binding guidance on implementation

s.art076

Monitoring

s.art077

Power to grant derogations

s.art078

General provisions

s.art080

Request for a derogation by a relevant system operator or relevant TSO

s.art081

Request for derogations from the provisions of Title III by a DC-connected power park module owner

s.art082

Register of derogations from the requirements of this Regulation

s.art083

Monitoring of derogations

s.art084

Amendment of contracts and general terms and conditions

s.art085

HVDC System or DC-connected power park modules connecting with synchronous areas or control areas not bound by EU legislation

s.art086

Entry into force