- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Operator4
Any Person3
Plus 2 duties on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Operator — also bound by 746 other Acts
Regulation (EU) No 965/2012 (Air Operations)
203 duties
Space Industry Regulations 2021
76 duties
Any Person — also bound by 2340 other Acts
Human Medicines Regulations 2012
184 duties
Merchant Shipping Act 1995
144 duties
Insolvency (England and Wales) Rules 2016
104 duties
Communications Act 2003
92 duties
Road Traffic Act 1988
92 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
s.art006
Regulatory aspects
Regulated
Other duties (1) — Crown / regulator
- Regulator must decide your complaint about a system operator or TSO within 2 monthsStatutory regulator
s.art032
Procedures for demand units within a demand facility or a closed distribution system connected at a voltage level of or below 1 000 V
Regulated
- Submit installation document before offering demand response capacityOperator
s.art033
Procedures for demand units within a demand facility or a closed distribution system connected at a voltage level above 1 000 V
Regulated
- Submit a Demand Register Update Document (DRUD) to the system operatorAny Person
s.art034
Responsibility of the demand facility owner, the distribution system operator and the closed distribution system operator
Regulated
- Demand facility owners and DSOs must ensure their systems comply with EU 2016/1388Any Person
s.art035
Tasks of the relevant system operator
Regulated
Other duties (1) — Crown / regulator
- System operator must assess demand connection compliance and publish requirementsStatutory regulator
s.art036
Common provisions for compliance testing
Regulated
- Ensure your demand facility passes compliance tests ordered by the system operatorAny Person
s.art042
Common provisions on compliance simulations
Regulated
- Provide compliance simulation reports and validated models to the system operatorOperator
s.art045
Compliance simulations for demand units with demand response very fast active power control
Regulated
- Run compliance simulation for very fast active power controlOperator
s.art049
Principles of cost-benefit analysis
Regulated
- Assist in cost-benefit analyses and follow CBA principles when preparing your ownOperator
53 other provisions — procedural and definitional
s.annex ii para.1
The table shows the minimum time periods during which a...
s.annex ii para.2
The table shows the minimum time periods during which a...
s.annex i para.1
The table shows the minimum time periods for which a...
s.art001
Subject matter
s.art002
Definitions
s.art003
Scope of application
s.art004
Application to existing transmission-connected demand facilities, existing transmission-connected distribution facilities, existing distribution systems and existing demand units used to provide demand response services
s.art005
Application to pump-storage power generating modules and industrial sites
s.art007
Multiple TSOs
s.art008
Recovery of costs
s.art009
Public consultation
s.art010
Stakeholder involvement
s.art011
Confidentiality obligations
s.art012
General frequency requirements
s.art013
General voltage requirements
s.art014
Short-circuit requirements
s.art015
Reactive power requirements
s.art016
Protection requirements
s.art017
Control requirements
s.art018
Information exchange
s.art019
Demand disconnection and demand reconnection
s.art020
Power quality
s.art021
Simulation models
s.art022
General provisions
s.art023
Energisation operational notification
s.art024
Interim operational notification
s.art025
Final operational notification
s.art026
Limited operational notification
s.art027
General provisions
s.art028
Specific provisions for demand units with demand response active power control, reactive power control and transmission constraint management
s.art029
Specific provisions for demand units with demand response system frequency control
s.art030
Specific provisions for demand units with demand response very fast active power control
s.art031
General provisions
s.art037
Compliance testing for disconnection and reconnection of transmission-connected distribution facilities
s.art038
Compliance testing for information exchange of transmission-connected distribution facilities
s.art039
Compliance testing for disconnection and reconnection of transmission-connected demand facilities
s.art040
Compliance testing for information exchange of transmission-connected demand facilities
s.art041
Compliance testing for demand units with demand response active power control, reactive power control and transmission constraint management
s.art043
Compliance simulations for transmission-connected distribution facilities
s.art044
Compliance simulations for transmission-connected demand facilities
s.art046
Compliance monitoring for transmission-connected distribution facilities
s.art047
Compliance monitoring for transmission-connected demand facilities
s.art048
Identification of costs and benefits of application of requirements to existing transmission-connected demand facilities, existing transmission-connected distribution facilities, existing distribution systems and existing demand units
s.art050
Power to grant derogations
s.art051
General provisions
s.art052
Request for a derogation by a demand facility owner, a distribution system operator or a closed distribution system operator
s.art053
Request for a derogation by a relevant system operator or relevant TSO
s.art054
Register of derogations from the requirements of this Regulation
s.art055
Monitoring of derogations
s.art056
Non-binding guidance on implementation
s.art057
Monitoring
s.art058
Amendment of contracts and general terms and conditions
s.art059
Entry into force
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.