At a glance

What's here

9 compliance obligations

Who this Act binds

Plus 2 non-business duties on Crown ministers, regulators, local authorities or tribunals — shown collapsed under each section below.

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

s.art006

Regulatory aspects

Other duties (1) — Crown / regulator
  • Regulator must decide your complaint about a system operator or TSO within 2 months Statutory regulator
s.art032

Procedures for demand units within a demand facility or a closed distribution system connected at a voltage level of or below 1 000 V

  • Submit installation document before offering demand response capacity
s.art033

Procedures for demand units within a demand facility or a closed distribution system connected at a voltage level above 1 000 V

  • Submit a Demand Register Update Document (DRUD) to the system operator
s.art034

Responsibility of the demand facility owner, the distribution system operator and the closed distribution system operator

  • Demand facility owners and DSOs must ensure their systems comply with EU 2016/1388
s.art035

Tasks of the relevant system operator

Other duties (1) — Crown / regulator
  • System operator must assess demand connection compliance and publish requirements Statutory regulator
s.art036

Common provisions for compliance testing

  • Ensure your demand facility passes compliance tests ordered by the system operator
s.art042

Common provisions on compliance simulations

  • Provide compliance simulation reports and validated models to the system operator
s.art045

Compliance simulations for demand units with demand response very fast active power control

  • Run compliance simulation for very fast active power control
s.art049

Principles of cost-benefit analysis

  • Assist in cost-benefit analyses and follow CBA principles when preparing your own
Browse 53 other sections — procedural / definitional / commencement
s.annex ii para.1

The table shows the minimum time periods during which a...

s.annex ii para.2

The table shows the minimum time periods during which a...

s.annex i para.1

The table shows the minimum time periods for which a...

s.art001

Subject matter

s.art002

Definitions

s.art003

Scope of application

s.art004

Application to existing transmission-connected demand facilities, existing transmission-connected distribution facilities, existing distribution systems and existing demand units used to provide demand response services

s.art005

Application to pump-storage power generating modules and industrial sites

s.art007

Multiple TSOs

s.art008

Recovery of costs

s.art009

Public consultation

s.art010

Stakeholder involvement

s.art011

Confidentiality obligations

s.art012

General frequency requirements

s.art013

General voltage requirements

s.art014

Short-circuit requirements

s.art015

Reactive power requirements

s.art016

Protection requirements

s.art017

Control requirements

s.art018

Information exchange

s.art019

Demand disconnection and demand reconnection

s.art020

Power quality

s.art021

Simulation models

s.art022

General provisions

s.art023

Energisation operational notification

s.art024

Interim operational notification

s.art025

Final operational notification

s.art026

Limited operational notification

s.art027

General provisions

s.art028

Specific provisions for demand units with demand response active power control, reactive power control and transmission constraint management

s.art029

Specific provisions for demand units with demand response system frequency control

s.art030

Specific provisions for demand units with demand response very fast active power control

s.art031

General provisions

s.art037

Compliance testing for disconnection and reconnection of transmission-connected distribution facilities

s.art038

Compliance testing for information exchange of transmission-connected distribution facilities

s.art039

Compliance testing for disconnection and reconnection of transmission-connected demand facilities

s.art040

Compliance testing for information exchange of transmission-connected demand facilities

s.art041

Compliance testing for demand units with demand response active power control, reactive power control and transmission constraint management

s.art043

Compliance simulations for transmission-connected distribution facilities

s.art044

Compliance simulations for transmission-connected demand facilities

s.art046

Compliance monitoring for transmission-connected distribution facilities

s.art047

Compliance monitoring for transmission-connected demand facilities

s.art048

Identification of costs and benefits of application of requirements to existing transmission-connected demand facilities, existing transmission-connected distribution facilities, existing distribution systems and existing demand units

s.art050

Power to grant derogations

s.art051

General provisions

s.art052

Request for a derogation by a demand facility owner, a distribution system operator or a closed distribution system operator

s.art053

Request for a derogation by a relevant system operator or relevant TSO

s.art054

Register of derogations from the requirements of this Regulation

s.art055

Monitoring of derogations

s.art056

Non-binding guidance on implementation

s.art057

Monitoring

s.art058

Amendment of contracts and general terms and conditions

s.art059

Entry into force

Explore more

Browse legislation

Find other UK business legislation with related guidance.