Retained EU Law SI 2006/1850 United Kingdom

Commission Regulation (EC) No 1850/2006 of 14 December 2006 laying down detailed rules for the certification of hops and hop products

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Manufacturer2 Any Person1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Manufacturer — also bound by 502 other Acts
Any Person — also bound by 2340 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art003 Hops presented for certification Regulated
  • Provide a signed declaration with each consignment of hops for certificationManufacturer
s.art010 Preparation within a closed operating circuit Regulated
  • Prepare hops only in a closed operating circuit for certificationAny Person
s.art017 Information on the package Regulated
  • Label each hop package with required product informationManufacturer
27 other provisions — procedural and definitional
s.annex iii para.1 Packages shall be marked as follows, depending on the type...
s.annex iii para.2 for hop cones put up in bales or ballots: printing...
s.annex iv para.1 Substances permitted in the standardisation of hop extracts:
s.annex iv para.2 glucose syrups; hot water extract prepared from hops.
s.art001 Subject matter and scope
s.art002 Definitions
s.art004 Marketing requirements
s.art005 Sampling
s.art006 Certification procedure
s.art007 Blending
s.art008 Resale
s.art009 Certification procedure
s.art011 Official surveillance during production of hop products
s.art012 Information and record keeping
s.art013 Change of packaging
s.art014 Blending
s.art015 Resale
s.art016 Certificate
s.art018 Hops from experimental strains
s.art019 Proof of certification
s.art020 Specific requirements
s.art021 Competent certification authority
s.art022 Approval of certification centres
s.art023 Lists
s.art024 Publication of lists
s.art025 Repeal
s.art026 Entry into force

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.