High-rise fire safety compliance checklist
Quick compliance checklist for high-rise residential building duty holders. Verify your building meets Fire Safety (England) Regulations 2022 requirements for buildings 18 metres or higher, or 7+ storeys.
High-rise fire safety compliance at a glance
Use this checklist to verify your high-rise residential building (18 metres or higher, or 7+ storeys) meets Fire Safety (England) Regulations 2022 requirements. This is for experienced duty holders who know their obligations - for full guidance, see our detailed guides.
Applies to: Buildings in England with at least 2 residential units that are either 18 metres or higher, or have 7 or more storeys.
-
Secure information box installed and populated
Verify:
- Box installed near main entrance or firefighter access point
- Uses Gerda key lock (or your local FRS standard)
- Contains hard copy floor plans for every floor
- Contains building orientation plan
- Contains your name and 24/7 UK contact details
- Information is current and dated
-
Floor plans prepared and submitted to FRS
Verify:
- Floor plans exist for every floor
- Plans show layout, fire safety equipment, escape routes, and firefighting equipment
- Building orientation plan prepared (single page showing overall layout)
- Electronic copies submitted to local Fire and Rescue Authority
- Plans updated after any building changes
Floor plan detailed requirements
Full guidance on what floor plans must show and how to submit them to your Fire and Rescue Service
-
Wayfinding signage installed on all floors
Verify:
- Floor number visible on every floor (lift lobbies and stairwells)
- Each stairwell has unique identifier (e.g., Stairwell A, Stairwell B)
- Signs are photoluminescent (glow in dark)
- Signs positioned at eye level (1.4-1.7m)
- Signs not faded, damaged, or obscured
- Stairwell identifiers match floor plan labels
-
Quarterly fire door inspections up to date
Verify:
- Last quarterly inspection of communal doors within past 3 months
- Last annual inspection of flat entrance doors within past 12 months
- Inspection records complete (date, inspector, findings, remedial actions)
- Any defects identified have been remediated
- Self-closers working on all fire doors
- Intumescent strips and smoke seals intact
Fire door inspection requirements
Detailed guidance on what to check, inspection frequencies, and competency requirements
-
Monthly lifts and equipment checks documented
Verify (where installed):
- Firefighting lift checked this month (firefighting mode, communication, recall)
- Evacuation lift checked this month (operation, communication, power)
- Automatic door release mechanisms checked (doors release and close on alarm)
- Evacuation alert system checked (audible throughout building)
- Records kept with date, inspector name, findings, and actions
-
External wall information recorded and submitted
Verify:
- External wall materials documented (cladding, insulation, fixings)
- Wall system design recorded (construction methodology, layers)
- Fire safety features documented (cavity barriers, fire stopping)
- Information provided to Fire and Rescue Authority
- Records updated after any external wall alterations
- Ready to provide to residents on request (buildings 18m+)
External wall information duties
How to compile and submit external wall information under Regulation 5
-
Resident fire safety information distributed
Verify:
- All residents have received fire safety information
- Information explains the evacuation strategy (stay put or simultaneous)
- Information explains what to do if fire discovered or alarm sounds
- Information explains fire door importance and why they must stay closed
- Your contact details included for reporting concerns
- Information in accessible formats for all residents
- New residents receive information on move-in
-
Fire risk assessment covers external walls
Verify:
- Fire risk assessment is written and dated
- Assessment explicitly covers external walls (including cladding, balconies)
- Assessment covers flat entrance doors opening onto common parts
- Assessment reviewed within past 12 months (or after significant changes)
- Significant findings recorded and actioned
- Assessor was competent (consider BAFE SP205 certification for complex buildings)
High-rise fire safety requirements
Full guide to all Fire Safety (England) Regulations 2022 requirements for high-rise residential buildings
Key inspection frequencies
Item Frequency Applies to Communal fire doors Quarterly Buildings 11m+ Flat entrance doors Annual Buildings 11m+ Firefighting lifts Monthly Buildings 18m+ or 7+ storeys Evacuation lifts Monthly Buildings 18m+ or 7+ storeys Automatic door release Monthly Buildings 18m+ or 7+ storeys Fire risk assessment review Annual (minimum) All buildings Records to maintain
Fire and Rescue Authority inspectors will ask to see:
- Fire risk assessment (written, dated, signed)
- Fire door inspection records (quarterly communal, annual flat doors)
- Monthly lift and equipment check records
- External wall information records
- Proof of resident information distribution
- Evidence of floor plans submitted to FRA
- Any remedial work completion records
Detailed guidance
Fire safety for high-rise buildings
Comprehensive guide to all Fire Safety (England) Regulations 2022 duties for high-rise residential buildings
Fire door inspections
Detailed guidance on fire door inspection requirements, what to check, and competency
Provide information to Fire and Rescue Service
How to prepare and submit building information including floor plans and external wall data
legislation.gov.uk
Fire Safety (England) Regulations 2022 (opens in a new tab)
Full text of the regulations
gov.uk
Government guidance on Fire Safety Regulations (opens in a new tab)
Fact sheets and implementation guidance from the Home Office