Prepare a safety case report for a higher-risk building

In occupied higher-risk buildings in England, the principal accountable person must prepare a safety case report as soon as reasonably practicable after occupation or, if later, taking that role. They must notify the Building Safety Regulator, supply copies when asked and revise it after further assessments or steps if they consider this necessary or appropriate.

England

A safety case report records the building safety risks in an occupied higher-risk building and the steps taken to manage them. One person prepares it for the building: the principal accountable person (PAP). The regulator is the Building Safety Regulator (BSR). The duties have applied since 16 January 2024.

Buildings and people covered

The duty to prepare a report applies to an occupied higher-risk building in England. A higher-risk building is a building in England that is at least 18 metres high or has at least 7 storeys, and that contains at least 2 residential units. It is occupied if there are residents of more than one residential unit in it.

A building is not a higher-risk building if it consists entirely of any of these:

  • a care home
  • a hospital
  • a secure residential institution
  • a hotel
  • military barracks
  • living accommodation provided by the Ministry of Defence
  • living accommodation for His Majesty's forces, or for a visiting force or an international headquarters or defence organisation designated under the International Headquarters and Defence Organisations Act 1964

A building used for residential and non-residential purposes, in which all the living accommodation is provided by the Ministry of Defence, is also not a higher-risk building. Otherwise, a mixed-use building with at least 2 residential units can still qualify: the listed exclusions apply only to a building that consists entirely of those uses.

If you are the PAP, the report is your duty alone, not that of every accountable person. Where a building has one accountable person, that person is the PAP. Where it has more than one, the PAP is the accountable person who holds a legal estate in possession in the relevant parts of the structure and exterior of the building, or, holding no legal estate in any part of the building, has a relevant repairing obligation for them. The relevant parts are the structure and exterior, except so far as they are included in a demise of a single dwelling or of premises to be occupied for the purposes of a business. Where more than one accountable person meets that test, the First-tier Tribunal can, on an application, decide which of them is the PAP.

When to prepare the report

You must prepare the report as soon as reasonably practicable after the relevant time. The relevant time is the time when the building becomes occupied or, if later, the time when you become the PAP. If you become the PAP of a building that is already occupied, the time runs from the day you become the PAP.

BSR's guidance says you should prepare the report as soon as possible in either case. It also says you must not wait to be told to apply for a building assessment certificate before preparing it.

The assessments and steps the report draws on

The report contains the output of the duties to assess and manage building safety risks, which fall on each accountable person for their own part of the building. The report itself must still cover the assessments and steps of every accountable person for the building.

If you are an accountable person for an occupied higher-risk building, whether or not you are the PAP, you must assess the building safety risks in the part of the building you are responsible for, as soon as reasonably practicable after the relevant time. For an accountable person, the relevant time is the time when the building becomes occupied or, if later, the time when you become an accountable person for the building. A building safety risk is a risk to the safety of people in or about a building from the spread of fire, from structural failure, or from any other matter prescribed by regulations.

Further assessments must be made in each of these cases:

  • at regular intervals
  • at any time you have reason to suspect that the current assessment is no longer valid
  • at the direction of BSR, within the period the direction specifies

Each assessment must be suitable and sufficient to let you comply with the duty to manage risks.

That duty requires you, as an accountable person, to take all reasonable steps for these purposes:

  • preventing a building safety risk materialising in the part of the building you are responsible for
  • reducing the severity of any incident resulting from such a risk materialising

You must take the steps promptly and in accordance with prescribed principles. You must also make and give effect to arrangements to ensure the effective planning, organisation, control, monitoring and review of those steps.

What the report must contain

The report must contain both of these:

  • any assessment of the building safety risks made by an accountable person for the building
  • a brief description of any steps taken to manage those risks by an accountable person for the building

The regulations add these items that you, as the PAP, must include:

  • the registration number given to the building on the register
  • a brief description of the building and its wider environment
  • a description of the possible scenarios of building safety risks identified by each accountable person through the risk assessment, the likelihood of those risks materialising and the assessment of the likely consequences if they do
  • a description of how the steps taken by each accountable person demonstrate compliance with the duty to manage risks
  • a description summarising the system for managing safety for the building, including how safety measures are tested and maintained, and the policies and procedures for managing works to the building (covering the competence of the designers and contractors appointed, the quality of materials used, and the assessment and management of building safety risks while works are in progress)
  • a description of the emergency plans for the building, including the equipment in place to allow emergency services to respond, the information given to emergency services to support their response planning, and what residents are expected to do and how they are to respond in an emergency

The report must be kept in electronic form. BSR may direct how a report or a notification is to be given, including through a website address it provides for that purpose. It must publish any such direction on its website.

BSR's guidance asks for much more than the regulations require. It sets out further topics for the report, including:

  • basic building information such as the build date, height, number of storeys and floor plans
  • the people responsible for the building and how they share information
  • construction methods and materials, and the structural condition of the building
  • fire safety measures, compartmentation, fire doors, escape routes, detection and warning systems, and sprinklers or other suppression systems
  • how the building safety risk assessments were carried out, and their findings

BSR says the report should contain these topics. It also says that where you have not found information about the building, the report should explain what you did to try to find it. BSR also says to include a date or a version number, or both, to identify the latest version. Where these go beyond the items the regulations list, they are BSR's expectations, not requirements of the Act or the regulations.

Revise the report

As the PAP, you must revise the report if you consider it necessary or appropriate to do so following either of these:

  • any further assessment of building safety risks made by an accountable person for the building
  • the taking of further steps to manage building safety risks by an accountable person for the building

The Act sets no fixed review period for the report. Whether to revise turns on your judgement after either of those events.

Tell BSR and give it a copy

As the PAP, you must notify BSR as soon as reasonably practicable after preparing or revising the report. This applies to every revision, whatever it changes. A notification of a revised report must include an overview of the main revisions and an explanation of why the revision was made. Notifying BSR does not by itself require sending the report.

BSR says that, when told of an update, it will ask for the date of the update, a brief description and the reason for making it. It says it may ask for the updated report, and that a charge is payable if it decides to review an updated report. The amount is set in the BSR charging scheme.

The law does not require you to send the report to BSR routinely. A copy goes to BSR in these cases:

  • where BSR asks you for a copy, you must give it as soon as reasonably practicable
  • with an application for a building assessment certificate, which must be accompanied by a copy of the most recent report unless a copy of that report has already been given because BSR asked for it

An application for a building assessment certificate arises only where BSR directs you to apply. You must then make the application within the period of 28 days beginning with the day on which the direction is given. Contravening that requirement without reasonable excuse is an offence.

Enforcement and penalties

The duties to assess risks, manage them, prepare the report, revise it and notify BSR carry no offence of their own. A breach is a contravention of a relevant requirement, meaning any requirement on an accountable person under Part 4 of the Act or regulations made under it, except one that regulations prescribe as excepted. A breach can lead to a compliance notice from BSR and, where it places people at critical risk, to an offence.

BSR may give you a compliance notice if you are an accountable person for a higher-risk building and it appears to BSR that you have contravened, are contravening or are likely to contravene a relevant requirement. The notice either requires specified steps within a specified period or requires you to remedy the contravention or the matters giving rise to it within a specified period. Where it appears to BSR that the contravention has placed or will place people in or about the building in imminent danger, BSR may specify that the notice is an urgent action notice. A person who, without reasonable excuse, contravenes a compliance notice commits an offence.

As an accountable person, you also commit an offence if, without reasonable excuse, you contravene a relevant requirement and the contravention places one or more people in or about the building at critical risk. Critical risk means a significant risk of death or serious injury arising from a building safety risk.

The same penalties apply to the compliance notice offence, the critical risk offence and the offence of failing to apply for a building assessment certificate within 28 days:

  • on summary conviction, imprisonment for up to 12 months, or a fine, or both
  • on conviction on indictment, imprisonment for a term not exceeding 2 years, or a fine, or both
  • in either case, on summary conviction, a further fine not exceeding level 1 on the standard scale for each day on which the default continues after the initial conviction

The Act sets no upper limit on the main fine in these offences. Only the daily fine is capped, at level 1.

Where a body corporate commits an offence under Part 2 or 4, a director, manager, secretary or other similar officer of it, or a person purporting to act as one, also commits the offence and is liable to be proceeded against and punished accordingly, in either of these cases:

  • the offence is committed with that person's consent or connivance
  • the offence is attributable to neglect on that person's part

For offences under Part 4, a director of a resident management company, a right to manage company or a commonhold association that is an accountable person is not liable in this way if both of these apply:

  • the director is not entitled to remuneration from the company
  • one or more, but not all, of the company's directors have been appointed for a building safety purpose and are entitled to remuneration from the company

It is a separate offence to provide false or misleading information to BSR, where the person knows the information is false or misleading or is reckless as to whether it is, in any of these cases:

  • in purported compliance with Part 4 or regulations made under it
  • in connection with an application made under it
  • for the purpose of avoiding enforcement action being taken or continued

On summary conviction the penalty is imprisonment for up to 12 months, or a fine, or both. On conviction on indictment it is imprisonment for a term not exceeding 2 years, or a fine, or both.

Official guidance