Follow @guvnor.ai on TikTok (opens in a new tab)

Premises & Operations

Get electrical safety checks for a rented home in England

Landlords letting a home in England as someone's main residence must have a qualified person inspect and test its electrics before the tenancy starts and every 5 years at most, or earlier if the report says. Tenants must get the report, and required work is due within 28 days or any shorter period it sets.

Construction & Property England

Which tenancies are covered

The duties fall on a landlord who grants or intends to grant a specified tenancy. A specified tenancy is a tenancy of residential premises in England. It gives one or more people the right to occupy all or part of the premises as their only or main residence, with rent payable. The rent does not have to be a market rent.

A licence to occupy counts as a tenancy. A licensor of a home is a landlord for these rules. All specified tenancies are covered, whenever they were granted. Registered providers of social housing are also covered, and have separate duties for electrical equipment they provide.

The duties do not apply to a tenancy that:

  • is one under which the occupier shares any accommodation with the landlord or a member of the landlord's family
  • is a long lease, or grants a right of occupation for a term of 7 years or more
  • grants a right of occupation in a hall of residence in a building used wholly or mainly for the accommodation of students
  • grants a right of occupation in a hostel or refuge
  • grants a right of occupation in a care home, as defined in section 3 of the Care Standards Act 2000
  • grants a right of occupation in a hospital or hospice
  • provides accommodation as a result of a duty that an enactment imposes on an integrated care board or NHS England
  • grants a right of occupation in a moveable structure, vehicle or vessel

An occupier shares accommodation with the landlord or the landlord's family if they use an amenity in common with that person, whether or not also in common with others. An amenity includes a toilet, personal washing facilities, a kitchen or a living room. It does not include an area used for storage, a staircase, a corridor or other means of access.

A hostel is a building that meets two conditions. The first is that it is used for providing to persons generally, or to a class of persons, residential accommodation otherwise than in separate and self-contained premises, and board or facilities for the preparation of food adequate to their needs (or both). The second is that it is managed by a private registered provider of social housing, or it is not operated on a commercial basis and its costs of operation are provided whole or in part by a government department or agency or by a local authority, or it is managed by a voluntary organisation or charity.

A refuge is a building that meets the second condition and is used wholly or mainly for providing accommodation to persons who have been subject to any incident, or pattern of incidents, of controlling, coercive or threatening behaviour, physical violence, abuse of any other description (whether physical or mental), or threats of any such violence or abuse. A voluntary organisation is a body, other than a public or local authority, whose activities are not carried on for profit.

A tenancy does not grant a right of occupation for 7 years or more if either party can end the agreement at their option before the end of 7 years from the start of the term.

Homes let to people from more than one household who share facilities such as the bathroom and kitchen are covered, unless one of the exclusions applies. Communal areas of a building, such as stairwells and corridors, are not covered.

Inspect and test the installation

You must ensure the electrical safety standards are met during any period the premises are occupied under a specified tenancy. The standards are BS 7671, the 18th edition Wiring Regulations 2018.

You must ensure every electrical installation in the premises is inspected and tested by a qualified person at regular intervals. Regular intervals means no more than 5 years. Where the most recent report requires inspection and testing by an earlier date, it means no later than that date.

A qualified person is a person competent to undertake the inspection and testing, and any further investigative or remedial work, in accordance with BS 7671. There is no statutory register or named scheme.

The inspection covers the fixed electrical parts, such as wiring, socket-outlets, light fittings and the consumer unit. It includes permanently connected equipment such as showers and extractors, and the circuits for solar PV and battery storage. A separate specialist inspection may also be needed for solar PV or battery storage, in addition to the inspection and testing of the installation.

Following each inspection and test, you must obtain a report from the person who conducted it. The report must give the results and the date by which the next inspection and test is required.

Inspection before a tenancy starts

Since 1 November 2025, you must ensure every electrical installation in the premises is inspected and tested by a qualified person before the specified tenancy commences. This applies to tenancies that commence after that date. For a tenancy already running, the duty to inspect and test at regular intervals continues to apply. Different dates apply to a registered provider of social housing for a tenancy it granted before 1 December 2025. For that tenancy the duty applied from 1 May 2026, and the inspection and test had to take place before 1 November 2026 instead of before the tenancy commenced.

GOV.UK's guidance reads this more narrowly. It says a new inspection and testing is not required before a new tenancy where an inspection and test less than 5 years ago found no further investigative or remedial work was required. You must then give the new tenant a copy of the most recent report. The guidance recommends, but does not require, a visual check of the installation before each new tenancy.

GOV.UK's guidance says a new build or completely rewired home should have an Electrical Installation Certificate, and that landlords can give tenants, and the council if it asks, a copy of the certificate. It says the landlord is then not required to carry out further checks or provide a report for 5 years after the certificate was issued, as long as they have complied with their duties under the regulations.

The regulation's wording has no such exception.

Give copies of the report

You must supply copies of the report as follows.

Who receives the report When Which report
Each existing tenant of the premises Within 28 days of the inspection and test The report that follows that inspection and test
A new tenant under a specified tenancy of the premises Before that tenant occupies the premises The most recent report
A prospective tenant under a specified tenancy of the premises Within 28 days of receiving a request in writing from that person The most recent report
The local housing authority Within 7 days of receiving a request in writing from the authority The report that follows the inspection and test

A prospective tenant is someone who asks for information about the premises to decide whether to rent, asks to view, or makes an offer to rent, or someone to whom a registered provider of social housing makes an offer to let the premises.

You must also supply a copy of the report to the person carrying out the next inspection and test.

You must retain a copy of the report until the later of two dates. One is the date by which the next inspection and test is required. The other is the date on which it is conducted. This applies unless a more recent report supersedes it.

Carry out any further investigation or remedial work

This duty applies where the report indicates you are, or are potentially, in breach of the duty to meet the electrical safety standards, and the report requires you to undertake further investigative or remedial work.

Reports use codes. C1 means danger is present and C2 means potentially dangerous. For C1 or C2, remedial work is required and the installation is unsatisfactory for continued use. C3 means improvement is recommended and does not require remedial work. FI means further investigation is required without delay, and it must be carried out.

  1. Get the work done by a qualified person

    You must ensure the work is carried out within 28 days, or within the period the report specifies if that is less than 28 days. The period starts with the date of the inspection and testing.

  2. Get written confirmation from a qualified person

    The confirmation must say that the work has been carried out and that either the electrical safety standards are met or further investigative or remedial work is required. Acceptable confirmation includes a satisfactory EICR, an Electrical Installation Certificate, a Minor Electrical Installation Works Certificate or other appropriate electrical certification.

  3. Send the confirmation and the report

    You must supply the written confirmation, together with a copy of the report that required the work, to each existing tenant and to the local housing authority. Each must receive it within 28 days of completion of the work.

  4. Repeat the steps if more work is needed

    Where further investigative work shows that further investigative or remedial work is required, you must repeat the steps for that work.

What the council can do

The local housing authority where the premises are situated enforces the duties.

A remedial notice is for a breach of the duty to meet the standards, to inspect and test, or to carry out further investigative or remedial work. The authority must serve one where it has reasonable grounds to believe you are in that breach and the most recent report does not indicate that urgent remedial action is required. It must serve the notice within 21 days beginning with the day it decides it has reasonable grounds.

The notice requires you to take the action within 28 days beginning with the day it is served. You have 21 days to make written representations. If you make representations, the notice is suspended. The authority must tell you within 7 days beginning with the day the 21 days expires whether it confirms the notice. If it confirms the notice, you have 21 days from being told.

If the authority is satisfied, on the balance of probabilities, that you are in breach of the duty to comply with a remedial notice, it may arrange for an authorised person to take the action, but only with the consent of the tenants. It must first serve a notice on you. The authorised person must give the tenants not less than 48 hours' notice. You may appeal to the First-tier Tribunal within 28 days beginning with the day the notice is served. The authority may recover costs it reasonably incurs. You may appeal a demand for those costs within 21 days beginning with the day the demand is served.

Where the report indicates that urgent remedial action is required, the authority may arrange for an authorised person to take that action, but only with the consent of the tenants. It may do so only if it is satisfied, on the balance of probabilities, that you have not carried out the work within the period the report specifies. The authorised person must give the tenants not less than 48 hours' notice. The authority must give notice to you and to the occupiers, or fix it to the premises, within 7 days beginning with the day the work starts. You may appeal to the First-tier Tribunal within 28 days beginning with the start date given in the notice. The authority may recover costs it reasonably incurs, and you may appeal the demand within 21 days.

The reasonable-steps defence

You are not to be taken to be in breach of the duty to meet the standards, the duty to inspect and test, or the duty to carry out further investigative or remedial work if you can show you have taken all reasonable steps to comply. The same defence applies to the duty to comply with a remedial notice. The burden is on you to show it.

A tenant may prevent you, or a person acting for you, from entering the premises. You are not then considered to have failed to take all reasonable steps solely because you did not bring legal proceedings to secure entry. Keeping copies of all your communications with the tenant while you tried to arrange access could help show reasonable steps.

The defence does not cover the duties to obtain the report, give copies of it and keep a copy.

Licensed houses and houses in multiple occupation

A licence under Part 2 (HMO licensing, mandatory or additional) or Part 3 (selective licensing) of the Housing Act 2004 for a house in England must include conditions requiring the licence holder to ensure every electrical installation in the house is in proper working order and safe for continued use. The licence holder must also supply the council, on demand, with a declaration as to the safety of those installations.

The manager of a house in multiple occupation to which the Management of Houses in Multiple Occupation (England) Regulations 2006 apply must not unreasonably cause the gas or electricity supply used by any occupier to be interrupted. Those Regulations do not apply to converted blocks of flats to which section 257 of the Housing Act 2004 applies.

Official guidance