Business guidance

Rules, requirements and how-tos for running your business — organised by topic, with industry-specific guidance on the sector pages.

Guidance for mining & resources

Show all guidance
Mining & Resources

Control dust, firedamp and explosion risks in a coal mine

An underground coal mine must be notified to HSE 28 days before it is worked and needs a health and safety document before any work starts. You must detect and reduce firedamp, keep enough inert dust on roadways, ventilate continuously, sample respirable dust and plan escape and rescue.

Mining & Resources

Control explosion, well and major-accident risks in petroleum extraction

Every well, separator and store of hydrocarbons needs a DSEAR assessment and hazardous-area zoning. Onshore, tell HSE 21 days before drilling and prepare a health and safety document. Offshore, a production installation needs an accepted safety case before it operates.

Mining & Resources

DAERA consents for radioactive substances and peat extraction

The Northern Ireland consents that mining, quarrying and peat businesses can miss. Keeping or using radioactive material, or accumulating or disposing of radioactive waste, needs a certificate from DAERA under the Radioactive Substances Act 1993, which still applies in Northern Ireland. Extracting peat needs planning permission with environmental impact assessment, a habitats assessment and, on protected land, DAERA consent.

Food, Drink & Hospitality

Get authorisation for a water activity in Scotland (EASR)

In Scotland, any activity affecting surface water or groundwater, such as abstraction, engineering or discharges, needs SEPA authorisation, and doing it without one is a criminal offence. SEPA decides which of four risk-based tiers your activity falls into, from general binding rules to a permit.

Mining & Resources

Get the licences, permits and meet major-hazard duties for petroleum extraction

Extracting oil or gas without a petroleum production licence from the North Sea Transition Authority is unlawful. Offshore installations also need an accepted safety case, and onshore sites face COMAH and environmental permit duties.

Mining & Resources

Get the permits and consents for quarrying and mining

Every quarry or mine needs minerals planning permission before work starts. Environmental permits depend on what you do on site, so many simple stone quarries need none, but blasting needs an explosives licence.

Mining & Resources

Meet your coal mining regulatory duties

Deep or opencast coal mining needs a licence from the Mining Remediation Authority, which owns most unworked coal in Great Britain. Your working method decides your safety regime: deep mines follow the Mines Regulations 2014 and opencast sites the Quarries Regulations 1999.

Mining & Resources

Meet your worksite compliance duties for mining support

As a contractor on an offshore installation, at a mine or at a quarry, you must cooperate with the operator's safety management system and follow the safety regime for that site. The extraction licence and safety case stay with the operator, not you.

Mining & Resources

Metal ore mining: compliance checklist

Before you mine, appoint a mine manager, prepare your mine health and safety document and hold minerals planning permission. You also need environmental permits for mine water and extractive waste, an explosives licence if you blast, and a radioactive substances permit for uranium or thorium ore.

Mining & Resources

Run a metal ore mine under the Mines Regulations 2014

Tell HSE at least 28 days before you work a mine, and do no work until a health and safety document is in place. As mine operator you must appoint a competent manager, control ground movement, inrushes, fire and ventilation, and keep an escape and rescue plan.

Mining & Resources

Run a safe quarry under the Quarries Regulations 1999

Before any work starts at a quarry, prepare a health and safety document and appoint a competent person to take charge. Tell HSE within 14 days of opening. Have excavations and tips appraised, and keep silica dust below 0.1 mg/m³ over 8 hours.

Energy & Utilities

Use land 300 metres or deeper for petroleum or geothermal work

Section 43 of the Infrastructure Act 2015 gives a right to use land at least 300 metres below the surface to search for, prepare for and exploit petroleum or deep geothermal energy, without the surface owner's consent. The right does not replace your licence, planning permission or environmental permits.

General rules

Common requirements shown separately from guidance directly classified to this sector.