- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Plus 6 duties on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Statutory Undertaker — also bound by 179 other Acts
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
Other duties (1) — Crown / regulator
- Approving body must set 3-week response deadline for consulteesLocal authority
Other duties (1) — Crown / regulator
- Approving body must release non-performance bond within 4 weeks of adoption notice or after completing drainage workLocal authority
Other duties (1) — Crown / regulator
- Approving body must register drainage system and arrange designationLocal authority
Other duties (1) — Crown / regulator
- Approving body must release non-performance bond or account for work doneLocal authority
Other duties (1) — Crown / regulator
- Arrange registration and provisional designation within 4 weeks of voluntary adoption notificationLocal authority
- Notify approving body before starting works that may affect sustainable drainage on public landStatutory Undertaker
Other duties (1) — Crown / regulator
- Approving body must check drainage within 12 monthsLocal authority
10 other provisions — procedural and definitional
Help complying
Guvnor’s practical routes through this instrument.
SuDS approval in Wales: quick guide
Quick checklist for mandatory Sustainable Drainage Systems (SuDS) approval in Wales. Check if you need approval, how to apply to your local …
Construction compliance in Wales
1 more guide that reference this instrument
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.