UK Statutory Instrument SI 2025 United Kingdom

The Town and Country Planning (Entertainment Resort Complex, Bedford) Special Development Order 2025

Status
In Force

What it defines

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

8 other provisions — procedural and definitional
s.001 Citation, commencement, extent and application
s.002 Interpretation
s.003 Other planning permissions
s.004 Grant of planning permission
s.005 Conditions and limitations
s.006 Endorsement of submission documents
s.007 Modification of reference documents, controlling documents and endorsement conditions
s.008 Publication of documents
Schedules

Schedules

0 of 103 shown
103 other schedules
s.sch002 Visitor entertainment and hospitality facilities
s.sch002 Support for provision and operation of visitor entertainment and hospitality facilities
s.sch002 Rail-related development
s.sch002 Utilities and services
s.sch002 Walking, wheeling and cycling routes
s.sch002 Roads and associated infrastructure
s.sch002 Vehicle-related facilities
s.sch002 Security and reception
s.sch002 Landscaping and environmental measures, miscellaneous features, facilities and amenities
s.sch003 Interpretation of Schedule
s.sch003 Other dark corridors for bats
s.sch003 Time when development must be begun
s.sch003 Construction environmental management plan
s.sch003 Mass grading
s.sch003 Land remediation
s.sch003 Archaeological mitigation
s.sch003 Construction traffic management scheme
s.sch003 Broadmead Road
s.sch003 Broadmead Road level crossing
s.sch003 Interpretation of Part 5
s.sch003 Modification of zonal boundaries; ticketed area plan
s.sch003 Accommodation monitoring reports
s.sch003 Exceedances and accommodation management plans
s.sch003 Construction worker accommodation
s.sch003 Height controls: general
s.sch003 Height controls to secure an articulated skyline
s.sch003 Interpretation of Part 7
s.sch003 Requirement for masterplan or detailed design approval
s.sch003 Masterplans
s.sch003 Detailed designs: class 3 and class 6 authorised works
s.sch003 Detailed designs: other classes of authorised works
s.sch003 Designation of site controller and appointment of principal representative
s.sch003 Lake Zone (proximity to liquefied natural gas facility)
s.sch003 Reference design standards applicable to all parts of the Order land
s.sch003 Reference design standards applicable only to the Core Zone
s.sch003 Reference design standards applicable only to the East Gateway Zone
s.sch003 Reference design standards applicable only to the Lake Zone
s.sch003 Primary access points
s.sch003 Entertainment resort complex
s.sch003 Transport related development
s.sch003 Petrol filling or service station
s.sch003 Camp sites
s.sch003 Core controls
s.sch003 Conference and convention facilities
s.sch003 Sports venues with outdoor playing fields
s.sch003 Class 4 authorised works
s.sch003 Impact of authorised works on natural light in certain dwellings
s.sch003 Kempston Hardwick moated site
s.sch003 Veteran tree
s.sch003 ERC expansion areas
s.sch003 Means of enclosure with a height of more than 5.4 metres AGL
s.sch003 Battery energy storage system
s.sch003 Limits on extent of highway works
s.sch003 Experience and capability
s.sch003 Limits on extent of railway works
s.sch003 Limits on capacity, extent or use of certain energy and water infrastructure
s.sch003 Floorspace
s.sch003 Vehicle parking
s.sch003 Leadership in Energy and Environmental Design
s.sch003 Carbon management
s.sch003 Riparian protection zone
s.sch003 Flood risk
s.sch003 Storage capacity
s.sch003 Water conservation and supplies of non-potable water
s.sch003 Specified habitats: general
s.sch003 Culverts
s.sch003 Outfalls
s.sch003 Road crossing over Elstow Brook
s.sch003 Runoff
s.sch003 Sustainable drainage
s.sch003 Sustainable drainage systems: management and maintenance
s.sch003 Foul drainage
s.sch003 Water supplies
s.sch003 Kempston Hardwick Clay Pits (North)
s.sch003 Core capacity and features of ERC
s.sch003 Habitat location plan
s.sch003 Soft Opening Period and security and emergency management
s.sch003 Public access
s.sch003 Manor Road level crossing
s.sch003 Public rights of way
s.sch003 Wixams station (bus replacement service)
s.sch003 Travel plan
s.sch003 Restrictions on occupation before Grand Opening
s.sch003 Public roads in Lake Zone
s.sch003 Active travel
s.sch003 Traffic monitoring and management
s.sch003 Habitat creation and enhancement plans
s.sch003 Milton Keynes shuttle bus
s.sch003 Wixams shuttle bus
s.sch003 Firework displays
s.sch003 Drone shows
s.sch003 Pyrotechnic and laser effects
s.sch003 Noise and vibration
s.sch003 Seasonal events and special events
s.sch003 Hotels
s.sch003 1 and 2 Vine Cottages
s.sch003 Opening hours
s.sch003 Landscape and ecology management plans
s.sch003 Employment and skills

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.