The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (revoked)
At a glance
What this Act requires
Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.
Schedules
Browse 110 other Schedules — structural / supplementary
Ancillary Works
Interpretation
Drainage
Details of consultation
Stone curlew breeding plots
Applications made under requirements
Determination of applications by the planning authority
Further information
Register of requirements
Anticipatory steps towards compliance with any requirement
Time limits
Preparation of detailed design, etc.
Outline Environmental Management Plan
Archaeology
Protected species
Contaminated land and groundwater
Implementation and maintenance of landscaping
Traffic management
The enactments for the time being in force with respect...
(1) Without limitation on the scope of paragraph 1, the...
(1) Without limitation on the scope of paragraph 1, the...
Part 1 (compulsory purchase under Acquisition of Land Act 1946)...
(1) The modifications referred to in paragraph 4(a) are as...
These byelaws may be cited as the A303 (Amesbury to...
Compliance with instructions and notices, etc.
Identification of authorised persons
Breaches by authorised persons
Attempted breach
Interpretation
Smoking etc.
Unacceptable behaviour
General safety
Unauthorised access and loitering
Traffic regulation
Dangerous goods
Name and address
An 11.6 kilometre length of new road
A 230 metre length of new road (B3086 northbound approach)
A 135 metre length of new road (Unclassified westbound approach)
A 140 metre length of new road (B3086 eastbound approach)
A 725 metre length of new road (realigned B3083)
A303 eastbound diverge slip road
A303 eastbound merge slip road
A303 westbound diverge slip road
A303 westbound merge slip road
A 570 metre length of existing A303 trunk road
A 350 metre length of existing A303 trunk road
A303 eastbound diverge slip road
A 1.24 kilometre length of existing A303 trunk road
A 345 metre length of existing A303 trunk road
A 985 metre length of new road
A 2.28 kilometre length of the existing A303 trunk road
A 345 metre length of the existing A303 trunk road
A303 eastbound merge slip road
A303 westbound diverge slip road
A303 westbound merge slip road
A360 northern link to new Longbarrow junction
Northbound and Southbound Link between the new northern and southern roundabouts at Longbarrow Junction
A360 south-eastern link to new Longbarrow junction
South-western link to new Longbarrow junction
The provisions of this Part of this Schedule have effect...
(1) Subject to sub-paragraphs (2) and (3), if by reason...
(1) For the protection of any operator, the following provisions...
The exercise of the powers of article 31 (statutory undertakers)...
(1) Subject to sub-paragraphs (2) to (4), if as the...
This Part of this Schedule does not apply to—
Nothing in this Part of this Schedule affects the provisions...
The provisions of this Part have effect for the protection...
In this Part of this Schedule— “construction” includes execution, placing,...
(1) Before commencing construction of a specified work, the undertaker...
Without limiting paragraph 18, the requirements which the drainage authority...
In this Part of this Schedule— “alternative apparatus” means alternative...
(1) Subject to sub-paragraph (2), any specified work, and all...
(1) Subject to sub-paragraph (5), the undertaker must from the...
Subject to paragraphs 24 and 25 and sub-paragraph 21(5)(b), if...
If by reason of the construction of the specified work...
The undertaker must make reasonable compensation for costs, charges and...
(1) The undertaker must make reasonable compensation for costs and...
The fact that any work or thing has been executed...
Any dispute arising between the undertaker and the drainage authority...
Application
Interpretation
This Part of this Schedule does not apply to apparatus...
Acquisition of apparatus
Removal of apparatus and rights for alternative apparatus
Facilities and rights for alternative apparatus
Retained apparatus: protection
Cathodic protection testing
Expenses
Damage to property and other losses
Co-operation and reasonableness
Miscellaneous
(1) The following provisions apply for the protection of the...
(1) Regardless of the temporary stopping up, alteration or diversion...
(1) Before commencing construction of any specified work, the undertaker...
Without limiting paragraph 40, the requirements which the Agency may...
(1) Subject to sub-paragraph (2), any specified work, and all...
(1) Subject to sub-paragraph (5) the undertaker must from the...
Subject to paragraphs 47 and 43(5)(b), if by reason of...
If by reason of construction of the specified work the...
(1) The undertaker must take all such measures as may...
The undertaker must make reasonable compensation for costs, charges and...
(1) The undertaker must make reasonable compensation for costs and...
Any dispute arising between the undertaker and the Agency under...
Despite any provision in this Order or anything shown on...
(1) If, in the exercise of the powers conferred by...
(1) Where, in accordance with the provisions of this Part...
(1) Not less than 21 days before starting the carrying...
(1) Subject to the following provisions of this paragraph, the...
Browse 68 other sections — procedural / definitional / commencement
Citation and commencement
Interpretation
Disapplication of legislative provisions
Development consent, etc. granted by the Order
Maintenance of the authorised development
Planning permission
Limits of deviation
Application of the 1991 Act
Construction and maintenance of new, altered or diverted streets and other structures
Permanent stopping up of streets and private means of access
Temporary stopping up and restriction of use of streets
Access to works
Discharge of water
Protective works to buildings
Authority to survey and investigate land
Removal of human remains
Felling or lopping of trees and hedgerows
Maintenance of drainage works
Compulsory acquisition of land
Compulsory acquisition of land – incorporation of the minerals code
Time limit for exercise of powers to possess land temporarily or to acquire land compulsorily
Compulsory acquisition of rights
Private rights over land
Power to override easements and other rights
Modification of Part 1 of the 1965 Act
Application of the 1981 Act
Acquisition of subsoil, etc., only
Rights over or under streets
Temporary use of land for constructing the authorised development
Temporary use of land for maintaining the authorised development
Statutory undertakers
Apparatus and rights of statutory undertakers in stopped up streets
Recovery of costs of new connection
Special category land
Disregard of certain interests and improvements
Set-off for enhancement in value of retained land
No double recovery
Power to operate and use the tunnel
Closing the tunnel
No apparatus in the tunnel area without consent
Removal of vehicles
Removal of obstructions
Dangerous goods
Byelaws relating to the tunnel area
Fixed penalty notices
Classification of roads, etc.
Clearways
Traffic regulation measures
Benefit of the Order
Consent to transfer benefit of Order
Application of landlord and tenant law
Operational land for purposes of the 1990 Act
Defence to proceedings in respect of statutory nuisance
Protective provisions
Certification of plans, etc.
Service of notices
Arbitration
Consents, agreements and approvals
A nationally significant infrastructure project as defined in sections 14...
Work No. 1 – as shown on sheets 1 to...
Work No. 2 – as shown on sheets 3 and...
Work No. 3 – as shown on sheets 2, 3,...
Work No. 4 – as shown on sheets 5, 14...
Work No. 5 – as shown on sheet 13 of...
Work No. 6 – as shown on sheets 5, 6,...
Work No. 7 – as shown on sheet 11 of...
Work No. 8 – as shown on sheets 3 and...
Work No. 9 – as shown on sheets 9 and...