UK Statutory Instrument SI 2014/2434 United Kingdom

The North Killingholme (Generating Station) Order 2014

Status
In Force

What it defines

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

54 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent
s.art004 Maintenance, decommissioning and demolition of authorised development
s.art005 Operation of generating station
s.art006 Benefit of the Order
s.art007 Guarantees in respect of payment of compensation
s.art008 Defence to proceedings in respect of statutory nuisance
s.art009 Street works
s.art010 Temporary stopping up of streets
s.art011 Access to works
s.art012 Agreements with street authority
s.art013 Crown rights
s.art014 Discharge of water
s.art015 Authority to survey and investigate the land
s.art016 Compulsory acquisition of land
s.art017 Power to override easements and other rights
s.art018 Private rights of way
s.art019 Time limit for exercise of authority to acquire land compulsorily
s.art020 Compulsory acquisition of rights
s.art021 Application of the Compulsory Purchase (Vesting Declarations) Act 1981
s.art022 Acquisition of subsoil only
s.art023 Acquisition of part of certain properties
s.art024 Rights under or over streets
s.art025 Temporary use of land for carrying out the authorised development
s.art026 Temporary use of land for maintaining authorised development
s.art027 Statutory
s.art028 Railway undertakings
s.art029 Application of landlord and tenant law
s.art030 Operational land for purposes of the
s.art031 Felling or lopping of trees
s.art032 Protective work to buildings
s.art033 Procedure in relation to certain approvals etc.
s.art034 Certification of plans, etc.
s.art035 Arbitration
s.art036 Deemed marine licence
s.art037 Protection of interests
Schedules

Schedules

0 of 84 shown
84 other schedules
s.sch001 Fencing and other means of site perimeter enclosure
s.sch001 Construction surface water drainage
s.sch001 Operational surface and foul water drainage
s.sch001 Contamination and groundwater
s.sch001 Archaeology
s.sch001 CEMP
s.sch001 Storage of liquids on site
s.sch001 Control of noise during construction
s.sch001 No part of the authorised development shall be carried out...
s.sch001 (1) Prior to commencement of construction Work No. 1 or...
s.sch001 Time limits etc.
s.sch001 Control of noise during operation
s.sch001 (1) No part of the authorised development shall be brought...
s.sch001 In any case where the noise levels specified in requirement...
s.sch001 (1) Operation of the authorised development shall not be commenced...
s.sch001 Construction hours
s.sch001 Piling
s.sch001 Construction of Work Nos. 6a and 6b
s.sch001 Combined heat and power
s.sch001 (1) Prior to the operation of Work No. 1, a...
s.sch001 Control of dust emissions during operation
s.sch001 Development masterplan
s.sch001 Construction and security lighting scheme
s.sch001 Permanent lighting scheme
s.sch001 Bat mitigation strategy
s.sch001 Water vole mitigation strategy
s.sch001 Other ecological matters
s.sch001 (1) No part of the authorised development comprised in Works...
s.sch001 CCS
s.sch001 (1) The undertaker must make a report (“carbon capture readiness...
s.sch001 (1) The generating station comprised in Work No. 1 shall...
s.sch001 Fire water
s.sch001 Detailed design
s.sch001 Drainage pond
s.sch001 Site waste management plan
s.sch001 Biomass fuel sustainability
s.sch001 Decommissioning
s.sch001 Requirements for written approval, etc.
s.sch001 Amendments to approved details
s.sch001 Flood warning and evacuation plan
s.sch001 Aerodrome safeguarding
s.sch001 Train speed at North Killingholme Haven Pits
s.sch001 Acoustic hoarding
s.sch001 (1) The authorised development shall be carried out in accordance...
s.sch001 Visual attenuation of train movements
s.sch001 Control of construction noise at North Killingholme Haven Pits
s.sch001 Changes approved by the relevant planning authority
s.sch001 Work No. 1
s.sch001 Site road
s.sch001 Provision of landscaping
s.sch001 Implementation and maintenance of landscaping
s.sch001 Highway works
s.sch006 Interpretation of Schedule
s.sch006 Applications made under requirement
s.sch006 Further information
s.sch006 Fees
s.sch006 Appeals
s.sch007 Interpretation
s.sch007 The works shall be carried out in accordance with a...
s.sch007 (1) Prior to any works commencing below the level of...
s.sch007 The licence holder must ensure that any coatings and treatments...
s.sch007 (1) The licence holder must only work and access the...
s.sch007 The licence holder must ensure that during the works all...
s.sch007 The licence holder must ensure that any equipment, temporary structures,...
s.sch007 (1) The licence holder must ensure that no waste concrete...
s.sch007 The licence holder must ensure that any oil, fuel or...
s.sch007 The licence holder must ensure that a Notice to Mariners...
s.sch007 Cooling water intake conditions
s.sch007 Addresses
s.sch007 Piling conditions
s.sch007 No percussive piling shall take place between 7 April and...
s.sch007 Where piling is required to be undertaken during March, September...
s.sch007 No percussive piling shall take place before 0600 hours or...
s.sch007 Detailed design
s.sch007 (1) The undertaker (and any agent, contractor or subcontractor acting...
s.sch007 General conditions
s.sch007 The licence holder must ensure that the MMO District Marine...
s.sch007 With respect to any conditions of this licence which require...
s.sch007 The MMO must be notified by the undertaker in writing...
s.sch007 The undertaker must ensure that a copy of this licence...
s.sch007 Should the licence holder become aware that any of the...
s.sch008 In the assessment of any sums payable to Network Rail...
s.sch008 The undertaker shall no later than 28 days from the...
s.schedule/1/part/1/paragraph/1 In North Lincolnshire