UK Statutory Instrument SI 2013/1734 United Kingdom

The Triton Knoll Offshore Wind Farm Order 2013

Status
In Force

What it defines

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

15 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent
s.art004 Maintenance of authorised project
s.art005 Operation of electricity generating station
s.art006 Benefit of the Order
s.art007 Abatement of works abandoned or decayed
s.art008 Deemed licence under the Marine and Coastal Access Act 2009
s.art009 Saving for
s.art010 Crown rights
s.art011 Certification of plans etc
s.art012 Arbitration
Schedules

Schedules

0 of 36 shown
36 other schedules
s.sch001 Interpretation
s.sch001 The undertaker shall ensure that timely and efficient notices to...
s.sch001 The undertaker shall notify Trinity House as soon as reasonably...
s.sch001 The undertaker shall provide reports on the availability of aids...
s.sch001 The undertaker shall notify the UK Hydrographic Office of the...
s.sch001 (1) The undertaker shall colour all structures yellow from at...
s.sch001 Provision against danger to navigation
s.sch001 Air traffic
s.sch001 Lighting
s.sch001 (1) Each wind turbine generator forming part of the authorised...
s.sch001 Onshore traffic management
s.sch001 Time limits
s.sch001 Aggregates dredging
s.sch001 Pipeline or cable crossings
s.sch001 Offshore decommissioning
s.sch001 Requirement for written approval
s.sch001 Detailed design parameters
s.sch001 Further offshore design requirements
s.sch001 (1) The total number of offshore substations forming part of...
s.sch001 The total length of the cables comprising Work No. 1(c)...
s.sch001 (1) No monopile foundation forming part of the authorised development...
s.sch001 Offshore safety management
s.sch001 Aids to navigation
s.sch002 (1) Each programme, statement, plan, protocol or scheme required to...
s.sch002 Reporting of engaged agents, contractors and vessels
s.sch002 Equipment and operation of vessels engaged in licensed activities
s.sch002 Pre-construction monitoring
s.sch002 Construction monitoring
s.sch002 Post construction surveys
s.sch002 Herring spawning
s.sch002 (1) The total length of the cables comprising Work No....
s.sch002 (1) No steel monopile foundation forming part of the authorised...
s.sch002 Notifications and inspections
s.sch002 Chemicals, drilling and debris
s.sch002 Force majeure
s.sch002 Pre-construction plans and documentation