UK Statutory Instrument 1994 United Kingdom

The Lydney and Parkend Light Railway (Extension and Amendment) Order 1994

At a glance

What's here

9 compliance obligations

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Schedules

s.sch003

The gates shall be secured in the closed position on...

  • Phil's Refuse Collection and Recycling must not cause nuisance or harm
s.sch003

The Company shall give notice in writing to the Secretary...

  • Notify Secretary of State and arrange crossing inspection
s.sch004

Such gates shall be kept constantly closed and locked across...

  • Keep railway crossing gates closed and locked at all times
s.sch004

The Company shall erect and maintain at such point within...

  • Erect and maintain warning signs at the level crossing
Browse 52 other Schedules — structural / supplementary
s.sch003

A gate shall be pivoted as close to the railway...

s.sch003

A stop board of standard railway design displaying the words...

s.sch003

An advance warning board of standard railway design shall be...

s.sch003

A lifting barrier shall be pivoted as close to the...

s.sch003

When lowered the barriers shall be as nearly horizontal as...

s.sch003

When the barriers are fully lowered their uppermost surfaces shall...

s.sch003

When in the fully raised position the barriers shall be...

s.sch003

The barriers shall be as light as possible but shall...

s.sch003

The barriers shall display on both front and rear faces...

s.sch003

Suitable screening shall be provided for each barrier machine to...

s.sch003

Three electric lamps, each of not less than 5 watts...

s.sch003

When closed to road vehicles the gates shall extend across...

s.sch003

A traffic light signal as prescribed by regulation 31(4) of...

s.sch003

A lamp which when illuminated shows a symbol of the...

s.sch003

An audible warning device shall be provided on or adjacent...

s.sch003

A reflectorised stop line of the size, colour and type...

s.sch003

A reflectorised pedestrian stop line of the size, colour and...

s.sch003

Where the specified road passes over the crossing, reflectorised edge...

s.sch003

The right hand edge of each of the carriageways over...

s.sch003

A traffic sign of the size, colour and type shown...

s.sch003

A traffic sign of the size, colour and type shown...

s.sch003

A telephone mounted in a cabinet and connected to the...

s.sch003

The uppermost surfaces of the gates shall be not less...

s.sch003

Any lighting which is provided shall be at least to...

s.sch003

A train driver’s flashing red or flashing white indicator shall...

s.sch003

Facilities shall be provided at the crossing to operate the...

s.sch003

Two independent power supplies shall be provided at the crossing,...

s.sch003

A standard level crossing speed restriction board, which shall be...

s.sch003

An advance warning board of standard railway design shall be...

s.sch003

Cattle-cum-trespass guards of standard railway design shall be provided adjacent...

s.sch003

The surface of the accommodation road over the crossing shall...

s.sch003

The gates shall be kept constantly closed across the accommodation...

s.sch003

The gates shall open outwards away from the railway and,...

s.sch003

Drivers shall bring their trains to a halt at the...

s.sch003

The carriageway shall be divided into two separate carriageways approximately...

s.sch003

The barriers shall be kept in the fully raised position...

s.sch003

When a train either occupies a track circuit or operates...

s.sch003

Not less than 27 seconds shall elapse between the time...

s.sch003

The intermittent red lights shall continue to show and the...

s.sch003

After a train has passed one of the standard level...

s.sch003

In the event of failure of both intermittent red lights...

s.sch003

If either barrier fails to rise from the lowered position...

s.sch003

Should a total power failure occur, provided the barriers have...

s.sch003

Each gate shall be provided with a suitable mechanism at...

s.sch003

If the white train driver’s indicator mentioned in paragraph 31...

s.sch003

The gates shall be as light as possible but shall...

s.sch003

The framework of the gates shall be comprised of parallel...

s.sch003

The gates shall each display a semi-circular plate of Red...

s.sch003

A sign shall be provided approximately 5 metres before the...

s.sch004

Conditions and Requirements to be observed by the Company

s.sch004

The drivers or guards of trains passing along the Company’s...

s.sch004

Such gates shall be made conspicuous by being periodically painted...

s.art006

Gauge of railway and motive power

  • Operate new railways on standard gauge and approved motive power
s.art007

Conveyance of passengers

  • Obtain Secretary of State's permission before carrying passengers on new railways and comply with safety conditions
s.art009

Construction of public level crossing for Lydney Bypass

  • Provide protective equipment and comply with safety conditions at the bypass crossing
s.art010

As to Parkend Crossing

  • Maintain level crossing gates and obtain County Council consent at Parkend crossing
s.art012

For protection of Railtrack

  • Comply with Railtrack's reasonable requirements for safe operation
Browse 7 other sections — procedural / definitional / commencement
s.art001

Citation and commencement

s.art002

Interpretation

s.art003

Incorporation and application of enactments

s.art004

Transfer of Railway

s.art005

Power to make railway

s.art008

Existing railway redefined

s.art011

For protection of public gas suppliers

Explore more

Browse legislation

Find other UK business legislation with related guidance.