Northern Ireland Statutory Rule SI 2012/396 United Kingdom

The Renewable Heat Incentive Scheme Regulations (Northern Ireland) 2012

Status
In Force

What it defines

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

56 other provisions — procedural and definitional
s.001 Citation and commencement
s.002 Interpretation
s.003 Renewable heat incentive scheme
s.004 (1) A plant meets the criteria for being an eligible...
s.005 Eligible installations generating heat from solid biomass
s.006 Eligible installations generating heat from solid biomass contained in municipal waste
s.007 Eligible installations generating heat using solar collectors
s.008 Eligible installations generating heat using heat pumps
s.009 Eligible installations which are CHP systems
s.010 Eligible installations generating heat using geothermal sources
s.011 Eligible installations generating heat using biogas
s.012 Other eligibility requirements for technologies
s.013 MCS certification for microgeneration heating equipment
s.014 Plants comprised of more than one plant
s.015 Excluded plants
s.016 Metering of plants in simple systems
s.017 Metering of plants in complex systems
s.018 Shared meters
s.019 Metering of CHP systems generating electricity only before 1st September 2010
s.020 Matters relating to all heat meters and steam measuring equipment
s.021 Additional metering requirements for plants generating heat from biogas
s.022 Applications for accreditation
s.023 Exceptions to duty to accredit
s.023 Suspension of the operation of the scheme
s.023 Voluntary buy-out arrangements
s.024 Changes in ownership
s.024 Changes in location of accredited RHI installations
s.025 Producers of biomethane
s.026 Preliminary accreditation
s.027 Interpretation
s.028 Participants using solid biomass contained in municipal waste
s.029 Participants using solid biomass in accredited RHI installations with an installation capacity of between 45kWth and 1MWth
s.030 Biogas produced from gasification or pyrolysis
s.031 Participants generating heat from biogas
s.032 Biomethane producers
s.033 Ongoing obligations: general
s.034 Ongoing obligations in relation to metering
s.035 Ongoing obligations in relation to the provision of information
s.036 Payment of periodic support payments to participants
s.037 Periodic support payments for accredited RHI installations in simple systems
s.038 Periodic support payments accredited RHI installations for complex systems
s.038 (1) No periodic support payments may be made in relation...
s.039 Fossil fuel contamination of solid biomass and fossil fuel used for permitted ancillary purposes
s.040 Fossil fuel contamination adjustment to periodic support payments for producers and combusters of biogas produced from gasification and pyrolysis
s.041 Periodic support payments to producers of biomethane
s.042 Treatment of additional RHI capacity
s.043 Power to temporarily withhold periodic support payments to investigate alleged non-compliance
s.044 Power to suspend periodic support payments where ongoing failure to comply
s.045 Power to permanently withhold or reduce a participant’s periodic support payments
s.046 Revocation of accreditation or registration
s.047 Overpayment notices and offsetting
s.048 Revocation of Part 7 sanctions
s.049 Power to inspect accredited RHI installations
s.050 Right of review
s.051 Publication of guidance and publication of specified information on the Department’s website
s.052 Notices
Schedules

Schedules

0 of 6 shown
6 other schedules
s.sch001 Information required for accreditation and registration
s.sch002 Information to be provided to the Department where biomass is used for combustion or production of biomethane
s.sch002 The information is information identifying to the best of the...
s.sch002 The information specified in paragraph 2 must be collated by...
s.sch002 The information specified in paragraph 2 must be provided for...
s.sch002 For the purpose of this Schedule— “energy crop” means a...

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.