- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Responsible Person13
Operator8
Licence Holder1
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Responsible Person — also bound by 108 other Acts
MH(CT)(S)A 2003
30 duties
Operator — also bound by 746 other Acts
Regulation (EU) No 965/2012 (Air Operations)
203 duties
Space Industry Regulations 2021
76 duties
Licence Holder — also bound by 225 other Acts
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
s.005
Duties of licensee
Regulated
- Ensure operator is competent and performs dutiesLicence Holder
s.006
Design and relocation notifications for production installation
Regulated
- Notify HSE about new or relocated offshore production installationsOperator
s.007
Safety case for production installation
Regulated
- Prepare and submit a safety case for your production installationOperator
s.009
Design notification and safety case for non-production installation to be converted
Regulated
- Submit design notification and safety case revisions for conversion of non-production installation to production installationOperator
s.010
Notification of combined operations
Regulated
- Notify HSE of combined operations at least 21 days in advanceResponsible Person
s.011
Safety case for dismantling fixed installation
Regulated
- Prepare and submit safety case revisions before dismantling a fixed installationOperator
s.013
Review of safety case
Regulated
- Review your offshore safety case and send a summary to the ExecutiveResponsible Person
s.014
Revision of safety case
Regulated
- Revise safety case when appropriate or when directed by the ExecutiveResponsible Person
s.015
Power of Executive in relation to safety cases and related documents
Regulated
- Prepare revisions to safety case when directed by the Executive and provide relevant documentsResponsible Person
s.016
Duty to conform with safety case
Regulated
- Follow the procedures in your current safety caseResponsible Person
s.017
Notification of well operations
Regulated
- Notify HSE before starting well operationsOperator
s.018
Keeping of documents
Regulated
- Keep current safety case, verification scheme and related records for required periodsResponsible Person
s.019
Verification schemes
Regulated
- Make and implement a verification scheme for safety-critical elementsResponsible Person
s.020
Review and revision of verification schemes
Regulated
- Review and revise verification scheme with independent competent personResponsible Person
s.021
Continuing effect of verification schemes
Regulated
- Keep your offshore installation's verification scheme effective at all timesResponsible Person
12 other provisions — procedural and definitional
s.001
Citation and commencement
s.002
Interpretation
s.003
Communication and storage of information by electronic means
s.004
Application within the territorial sea
s.008
Safety case for non-production installation
s.012
Management of health and safety and control of major accident hazards
s.022
Defence
s.023
Exemptions
s.024
Appeals
s.025
Amendments
s.026
Revocation
s.027
Transitional provisions
Schedules
Schedules
7 of 83 shown
s.sch002
Where a production installation is to be moved to a...
Regulated
- Include suitability explanation when moving a production installation to a new locationOperator
s.sch002
A general description of the means by which the management...
Regulated
- Include a description of how your management system ensures safe design and constructionOperator
s.sch003
A description of the extent to which the duty holder...
Regulated
- Include description of consideration of HSE matters in safety caseResponsible Person
s.sch004
A description of how the duty holder has ensured, or...
Regulated
- Describe compliance with PFEER Regulation 4(1) in your safety caseResponsible Person
s.sch005
The name and address of each duty holder preparing the...
Regulated
- List duty holders and confirm agreement on notificationResponsible Person
s.sch007
Where a well operation is to be carried out by...
Regulated
- Include well operation details and coordination plans in safety caseOperator
s.sch008
The principles to be applied by the duty holder for...
Regulated
- Apply Schedule 8 principles when selecting safety case personnel and reviewing the schemeResponsible Person
76 other schedules
s.sch002
The name and address of the operator of the installation....
s.sch002
A description of the design process from an initial concept...
s.sch002
A description of— (a) the chosen design concept, including suitable...
s.sch002
A description of— (a) the principal systems on the installation;...
s.sch002
A suitable plan of the intended location of the installation...
s.sch002
Particulars of the types of operation, and activities in connection...
s.sch002
A summary of the verification scheme prepared pursuant to regulation...
s.sch002
Where a non-production installation is to be converted for use...
s.sch003
The name and address of the operator of the installation....
s.sch003
A description of how the duty holder has ensured, or...
s.sch003
A description of arrangements made for protecting persons on the...
s.sch003
A description of the measures taken or to be taken...
s.sch003
A description of the main requirements in the specification for...
s.sch003
Particulars of any combined operations which may involve the installation,...
s.sch003
A summary of how any safety representatives for that installation...
s.sch003
A description, with suitable diagrams, of— (a) the main and...
s.sch003
A suitable plan of the location of the installation and...
s.sch003
Particulars of the types of operation, and activities in connection...
s.sch003
The maximum number of persons— (a) expected to be on...
s.sch003
Particulars of the plant and arrangements for the control of...
s.sch003
A description of any pipeline with the potential to cause...
s.sch004
The name and address of the owner of the installation....
s.sch004
A description of the main requirements in the specification for...
s.sch004
Particulars of— (a) the limits of the environmental conditions beyond...
s.sch004
A description of the arrangements for— (a) identifying the routes...
s.sch004
Particulars of any combined operations which may involve the installation,...
s.sch004
A summary of how any safety representatives for that installation...
s.sch004
A description, with suitable diagrams, of— (a) the main and...
s.sch004
Particulars of the types of operation, and activities in connection...
s.sch004
The maximum number of persons— (a) expected to be on...
s.sch004
Particulars of the plant and arrangements for the control of...
s.sch004
A description of arrangements made for protecting persons on the...
s.sch004
A description of the measures taken or to be taken...
s.sch005
A description of how the management systems for the installations...
s.sch005
Particulars of any plant to be used in connection with...
s.sch005
A summary of the joint review referred to in paragraph...
s.sch005
A description of the combined operation and a programme of...
s.sch006
The name and address of the operator of the installation....
s.sch006
The dates on which dismantling is expected to commence and...
s.sch006
A summary of how any safety representatives for that installation...
s.sch006
The maximum number of persons expected to be on the...
s.sch006
A description of how the duty holder will comply with...
s.sch006
A description of arrangements made for protecting persons on the...
s.sch006
A description of how the proposed arrangements, methods and procedures...
s.sch007
The name and address of the well operator.
s.sch007
Where the well operation is to be carried out—
s.sch007
Particulars of the fluids to be used to control the...
s.sch007
Particulars of any plant, not described in the current safety...
s.sch007
Particulars of the type of well, its number, and slot...
s.sch007
A description of the well operation and a programme of...
s.sch007
A description of— (a) any activities on or in connection...
s.sch007
In the case of a well which is to be...
s.sch007
In the case of an existing well—
s.sch008
Arrangements for the communication of information necessary for the proper...
s.sch008
The nature and frequency of examination and testing.
s.sch008
Arrangements for review and revision of the scheme.
s.sch008
The arrangements for the making and preservation of records showing—...
s.sch008
Arrangements for communicating the matters specified in paragraph 5 to...
s.sch009
In this Schedule— “appeal” means an appeal under regulation 24;...
s.sch009
(1) Where, after the hearing, the appointed person proposes to...
s.sch009
The appointed person shall notify the decision on the appeal,...
s.sch009
The Department shall direct that an appeal shall be determined...
s.sch009
Before the determination of an appeal, the appointed person shall...
s.sch009
An appointed person may give such directions as he thinks...
s.sch009
The Department may pay to an appointed person such remuneration...
s.sch009
(1) Subject to sub-paragraphs (2) and (3), a date, time...
s.sch009
(1) Not later than 21 days before the date of...
s.sch009
(1) The parties shall be entitled to appear at the...
s.sch009
(1) All hearings shall be held in private.
s.sch010
In the Offshore Installations (Safety Representatives and Safety Committees) Regulations...
s.sch010
In the Offshore Installations and Pipeline Works (Management and Administration)...
s.sch010
In the Offshore Installations (Prevention of Fire and Explosion, and...
s.sch010
In regulation 2(1) (interpretation) of the Reporting of Injuries, Diseases...
s.sch010
In the Offshore Installations and Wells (Design and Construction, etc.)...
s.sch010
In the Diving at Work Regulations (Northern Ireland) 2005 omit...
s.sch010
In the Health and Safety (Fees) Regulations (Northern Ireland) 2007...
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.