Northern Ireland Statutory Rule 2007 United Kingdom

The Offshore Installations (Safety Case) Regulations (Northern Ireland) 2007

At a glance

What's here

21 compliance obligations

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Schedules

s.sch002

Where a production installation is to be moved to a...

  • Include suitability explanation when moving a production installation to a new location
s.sch002

A general description of the means by which the management...

  • Include a description of how your management system ensures safe design and construction
s.sch003

A description of the extent to which the duty holder...

  • Include description of consideration of HSE matters in safety case
s.sch004

A description of how the duty holder has ensured, or...

  • Describe compliance with PFEER Regulation 4(1) in your safety case
s.sch005

The name and address of each duty holder preparing the...

  • List duty holders and confirm agreement on notification
s.sch008

The principles to be applied by the duty holder for...

  • Apply Schedule 8 principles when selecting safety case personnel and reviewing the scheme
Browse 77 other Schedules — structural / supplementary
s.sch002

The name and address of the operator of the installation....

s.sch002

A description of the design process from an initial concept...

s.sch002

A description of— (a) the chosen design concept, including suitable...

s.sch002

A description of— (a) the principal systems on the installation;...

s.sch002

A suitable plan of the intended location of the installation...

s.sch002

Particulars of the types of operation, and activities in connection...

s.sch002

A summary of the verification scheme prepared pursuant to regulation...

s.sch002

Where a non-production installation is to be converted for use...

s.sch003

The name and address of the operator of the installation....

s.sch003

A description of how the duty holder has ensured, or...

s.sch003

A description of arrangements made for protecting persons on the...

s.sch003

A description of the measures taken or to be taken...

s.sch003

A description of the main requirements in the specification for...

s.sch003

Particulars of any combined operations which may involve the installation,...

s.sch003

A summary of how any safety representatives for that installation...

s.sch003

A description, with suitable diagrams, of— (a) the main and...

s.sch003

A suitable plan of the location of the installation and...

s.sch003

Particulars of the types of operation, and activities in connection...

s.sch003

The maximum number of persons— (a) expected to be on...

s.sch003

Particulars of the plant and arrangements for the control of...

s.sch003

A description of any pipeline with the potential to cause...

s.sch004

The name and address of the owner of the installation....

s.sch004

A description of the main requirements in the specification for...

s.sch004

Particulars of— (a) the limits of the environmental conditions beyond...

s.sch004

A description of the arrangements for— (a) identifying the routes...

s.sch004

Particulars of any combined operations which may involve the installation,...

s.sch004

A summary of how any safety representatives for that installation...

s.sch004

A description, with suitable diagrams, of— (a) the main and...

s.sch004

Particulars of the types of operation, and activities in connection...

s.sch004

The maximum number of persons— (a) expected to be on...

s.sch004

Particulars of the plant and arrangements for the control of...

s.sch004

A description of arrangements made for protecting persons on the...

s.sch004

A description of the measures taken or to be taken...

s.sch005

A description of how the management systems for the installations...

s.sch005

Particulars of any plant to be used in connection with...

s.sch005

A summary of the joint review referred to in paragraph...

s.sch005

A description of the combined operation and a programme of...

s.sch006

The name and address of the operator of the installation....

s.sch006

The dates on which dismantling is expected to commence and...

s.sch006

A summary of how any safety representatives for that installation...

s.sch006

The maximum number of persons expected to be on the...

s.sch006

A description of how the duty holder will comply with...

s.sch006

A description of arrangements made for protecting persons on the...

s.sch006

A description of how the proposed arrangements, methods and procedures...

s.sch007

The name and address of the well operator.

s.sch007

Where a well operation is to be carried out by...

s.sch007

Where the well operation is to be carried out—

s.sch007

Particulars of the fluids to be used to control the...

s.sch007

Particulars of any plant, not described in the current safety...

s.sch007

Particulars of the type of well, its number, and slot...

s.sch007

A description of the well operation and a programme of...

s.sch007

A description of— (a) any activities on or in connection...

s.sch007

In the case of a well which is to be...

s.sch007

In the case of an existing well—

s.sch008

Arrangements for the communication of information necessary for the proper...

s.sch008

The nature and frequency of examination and testing.

s.sch008

Arrangements for review and revision of the scheme.

s.sch008

The arrangements for the making and preservation of records showing—...

s.sch008

Arrangements for communicating the matters specified in paragraph 5 to...

s.sch009

In this Schedule— “appeal” means an appeal under regulation 24;...

s.sch009

(1) Where, after the hearing, the appointed person proposes to...

s.sch009

The appointed person shall notify the decision on the appeal,...

s.sch009

The Department shall direct that an appeal shall be determined...

s.sch009

Before the determination of an appeal, the appointed person shall...

s.sch009

An appointed person may give such directions as he thinks...

s.sch009

The Department may pay to an appointed person such remuneration...

s.sch009

(1) Subject to sub-paragraphs (2) and (3), a date, time...

s.sch009

(1) Not later than 21 days before the date of...

s.sch009

(1) The parties shall be entitled to appear at the...

s.sch009

(1) All hearings shall be held in private.

s.sch010

In the Offshore Installations (Safety Representatives and Safety Committees) Regulations...

s.sch010

In the Offshore Installations and Pipeline Works (Management and Administration)...

s.sch010

In the Offshore Installations (Prevention of Fire and Explosion, and...

s.sch010

In regulation 2(1) (interpretation) of the Reporting of Injuries, Diseases...

s.sch010

In the Offshore Installations and Wells (Design and Construction, etc.)...

s.sch010

In the Diving at Work Regulations (Northern Ireland) 2005 omit...

s.sch010

In the Health and Safety (Fees) Regulations (Northern Ireland) 2007...

s.005

Duties of licensee

  • Ensure operator is competent and performs duties
s.006

Design and relocation notifications for production installation

  • Notify HSE about new or relocated offshore production installations
s.007

Safety case for production installation

  • Prepare and submit a safety case for your production installation
s.009

Design notification and safety case for non-production installation to be converted

  • Submit design notification and safety case revisions for conversion of non-production installation to production installation
s.010

Notification of combined operations

  • Notify HSE of combined operations at least 21 days in advance
s.011

Safety case for dismantling fixed installation

  • Prepare and submit safety case revisions before dismantling a fixed installation
s.013

Review of safety case

  • Review your offshore safety case and send a summary to the Executive
s.014

Revision of safety case

  • Revise safety case when appropriate or when directed by the Executive
s.015

Power of Executive in relation to safety cases and related documents

  • Prepare revisions to safety case when directed by the Executive and provide relevant documents
s.016

Duty to conform with safety case

  • Follow the procedures in your current safety case
s.017

Notification of well operations

  • Notify HSE before starting well operations
s.018

Keeping of documents

  • Keep current safety case, verification scheme and related records for required periods
s.019

Verification schemes

  • Make and implement a verification scheme for safety-critical elements
s.020

Review and revision of verification schemes

  • Review and revise verification scheme with independent competent person
s.021

Continuing effect of verification schemes

  • Keep your offshore installation's verification scheme effective at all times
Browse 12 other sections — procedural / definitional / commencement
s.001

Citation and commencement

s.002

Interpretation

s.003

Communication and storage of information by electronic means

s.004

Application within the territorial sea

s.008

Safety case for non-production installation

s.012

Management of health and safety and control of major accident hazards

s.022

Defence

s.023

Exemptions

s.024

Appeals

s.025

Amendments

s.026

Revocation

s.027

Transitional provisions

Explore more

Browse legislation

Find other UK business legislation with related guidance.