- Status
- In Force
What it defines
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
52 other provisions — procedural and definitional
s.001
Citation, commencement and revocation
s.001
Non-automatic weighing machines are divided into four classes of accuracy... (opens in a new tab)
s.002
Interpretation
s.003
Application
s.004
Purposes of use for trade
s.005
Parts of non-automatic weighing machines
s.006
Monetary indications
s.007
Manner of construction of the load receptor
s.008
Zero setting device
s.009
Accuracy classification
s.010
Verification scale interval
s.011
Adjustable levelling and level indicating devices
s.012
Approved patterns
s.013
Drainage
s.014
Approved minimum load
s.015
Scale intervals
s.016
Relevant markings
s.017
Units of measurement
s.018
Supplementary indications
s.019
Riders or other devices
s.020
Unit price indications
s.021
Customer check weighing and self service machines
s.022
Provision of sealing devices
s.023
Restriction on use where level indicating devices are fitted
s.024
Restriction on use where temperature range is marked
s.025
Manner of use
s.026
Manner of erection where weight or other printing device is fitted
s.027
Restriction on use when any live part is submerged in liquid
s.028
Manner of erection where load is stationery relative to load receptor
s.029
Accessibility
s.030
Use of weights to determine the value of load in metric units
s.031
Balance or zero setting
s.032
Pre-testing requirements
s.033
Permanent installations
s.034
Testing by use of weights or testing equipment
s.035
Operation by coin, currency note, credit card or other such device
s.036
Non-automatic weighing machines imported from an EEA State
s.037
Other testing requirements
s.038
Prescribed limits of error
s.039
Passing as fit for use for trade
s.040
Stamping
s.041
Obliteration of stamps
s.042
Powers and duties of inspector in relation to obliteration of stamps
s.043
Particular circumstances in which an inspector shall or may obliterate stamps
s.044
Other circumstances in which an inspector may obliterate stamps
s.045
Consequences of obliteration of stamp
s.046
“Out of use” notice
Schedules
Schedules
0 of 36 shown36 other schedules
s.sch001
A machine made in accordance with an approved pattern and...
s.sch001
The specifications for non-graduated and graduated Class I machines are...
s.sch001
A machine which is: (a) made in accordance with an...
s.sch001
The specifications for non-graduated and graduated Class II machines are...
s.sch001
A machine which is— (a) made in accordance with an...
s.sch001
The specifications for non-graduated and graduated Class III machines are...
s.sch001
A machine which is— (a) made in accordance with an...
s.sch001
The specifications for non-graduated and graduated Class IIII machines are...
s.sch001
For machines provided with several weight indicating or printing devices,...
s.sch001
For machines provided with graduated tare devices the smallest scale...
s.sch001
For machines fitted with a graduated verification device the scale...
s.sch002
Subject to the provisions of paragraph 17 on eccentric load...
s.sch002
Comparison testing
s.sch002
Alternative load balancing arrangement testing
s.sch002
Repeatability testing
s.sch002
Price-to-pay testing
s.sch002
Discrimination testing
s.sch002
Level indicator testing
s.sch002
Tilt testing
s.sch002
Eccentric load testing
s.sch002
(a) Subject to sub-paragraph (b)— (i) in the case of...
s.sch002
Locking or relieving gear testing
s.sch002
(1) Subject to the provisions of paragraph 16 on tilt...
s.sch002
Backbalance testing
s.sch002
When taking test readings from digital weight indicators or printers,...
s.sch002
In the case of a machine having an automatic zero...
s.sch002
In the case of a machine of an approved pattern...
s.sch002
When testing any machine, the inspector shall first ascertain—
s.sch002
Where feasible, the inspector may combine tests or carry out...
s.sch002
Weight indicating and weight printing devices
s.sch002
Interpretation
s.sch003
Subject to paragraphs 2 and 3, the prescribed limits of...
s.sch003
Note
s.sch003
Note
s.sch003
In the case where— (a) a machine has had its...
s.sch003
The requirements referred to in paragraph 3(c)(i) are that the...
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.