- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Any Person1
Plus 1 duty on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Any Person — also bound by 2340 other Acts
Human Medicines Regulations 2012
184 duties
Merchant Shipping Act 1995
144 duties
Insolvency (England and Wales) Rules 2016
104 duties
Communications Act 2003
92 duties
Road Traffic Act 1988
92 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
s.005
Authorised examiner
Regulated
- Follow strict rules if you are an authorised electricity meter examinerAny Person
s.008
Equivalent European Provisions
Regulated
Other duties (1) — Crown / regulator
- Meter examiners must accept EEA test results meeting equivalent standardsStatutory regulator
9 other provisions — procedural and definitional
s.001
Citation and commencement
s.002
Interpretation
s.003
Authorised manufacturer
s.004
Authorised repairer
s.006
Application for certification
s.007
Procedure for certification
s.009
Batch certification
s.010
Duration of certification
s.011
Fees
Schedules
Schedules
0 of 27 shown27 other schedules
s.sch001
Insulation property test
s.sch001
Pre-heating
s.sch001
Test loads
s.sch001
Non-registration test
s.sch001
Accuracy tests
s.sch001
Methods of accuracy test
s.sch001
Conditions for all testing
s.sch001
Multi-register meters
s.sch001
Ployphase meters
s.sch001
Margins of Error
s.sch002
In respect of each meter to which the report refers,...
s.sch002
In respect of each meter to which the report refers,...
s.sch002
A report may include the errors obtained at each test...
s.sch002
In the case of a meter intended for use with...
s.sch002
Where a transformer intended for use with a meter has...
s.sch002
A report for a transformer shall also include the following...
s.sch002
The meter or transformer errors obtained at each test load...
s.sch002
Before a meter is submitted for certification, the report on...
s.sch003
Pre-heating
s.sch003
Non-registration test
s.sch003
Accuracy tests
s.sch003
Methods of accuracy test
s.sch003
Conditions for testing
s.sch003
Test loads
s.sch003
Multi-register meters
s.sch003
Polyphase meters
s.sch003
Margins of error
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.