Northern Ireland Statutory Rule SI 1998/444 United Kingdom

Meters (Certification) Regulations (Northern Ireland) 1998

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Any Person1

Plus 1 duty on the regulator, Crown ministers and public bodies — folded into the section list below.

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Any Person — also bound by 2340 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.005 Authorised examiner Regulated
  • Follow strict rules if you are an authorised electricity meter examinerAny Person
s.008 Equivalent European Provisions Regulated
Other duties (1) — Crown / regulator
  • Meter examiners must accept EEA test results meeting equivalent standardsStatutory regulator
9 other provisions — procedural and definitional
s.001 Citation and commencement
s.002 Interpretation
s.003 Authorised manufacturer
s.004 Authorised repairer
s.006 Application for certification
s.007 Procedure for certification
s.009 Batch certification
s.010 Duration of certification
s.011 Fees
Schedules

Schedules

0 of 27 shown
27 other schedules
s.sch001 Insulation property test
s.sch001 Pre-heating
s.sch001 Test loads
s.sch001 Non-registration test
s.sch001 Accuracy tests
s.sch001 Methods of accuracy test
s.sch001 Conditions for all testing
s.sch001 Multi-register meters
s.sch001 Ployphase meters
s.sch001 Margins of Error
s.sch002 In respect of each meter to which the report refers,...
s.sch002 In respect of each meter to which the report refers,...
s.sch002 A report may include the errors obtained at each test...
s.sch002 In the case of a meter intended for use with...
s.sch002 Where a transformer intended for use with a meter has...
s.sch002 A report for a transformer shall also include the following...
s.sch002 The meter or transformer errors obtained at each test load...
s.sch002 Before a meter is submitted for certification, the report on...
s.sch003 Pre-heating
s.sch003 Non-registration test
s.sch003 Accuracy tests
s.sch003 Methods of accuracy test
s.sch003 Conditions for testing
s.sch003 Test loads
s.sch003 Multi-register meters
s.sch003 Polyphase meters
s.sch003 Margins of error

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.