UK Act of Parliament 2005 Scotland

Environmental Assessment (Scotland) Act 2005

Enforced by
NatureScot, HES
Status
In Force

What it defines

Sections creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

Part 1

Environmental assessment for plans and programmes

0 of 13 sections shown
Part 2

Environmental reports and consultation

0 of 4 sections shown
Part 3

Post-adoption procedures

0 of 2 sections shown
Part 4

Miscellaneous

0 of 1 section shown
1 other section in this Part — procedural and definitional
Part 5

General

0 of 6 sections shown
Schedules

Schedules

0 of 56 shown
56 other schedules
s.sch001 (1) Crude oil refineries except undertakings whose sole function is...
s.sch001 Waste disposal installations for— (a) the incineration; or
s.sch001 Groundwater abstraction or artificial groundwater recharge schemes where the annual...
s.sch001 (1) Works for the transfer of water resources between river...
s.sch001 Waste water treatment plants with a capacity exceeding 150,000 population...
s.sch001 Extraction of petroleum and natural gas for commercial purposes where...
s.sch001 Dams and other installations designed for the holding back or...
s.sch001 Pipelines for the transport of gas, oil or chemicals with...
s.sch001 Installations for the intensive rearing of poultry or pigs with...
s.sch001 Industrial plants for the— (a) production of pulp from timber...
s.sch001 (1) Quarries and open-cast mining where the surface of the...
s.sch001 (1) Thermal power stations and other combustion installations with a...
s.sch001 Construction of overhead electrical power lines with a voltage of...
s.sch001 Installations for storage of petroleum, petrochemical, or chemical products with...
s.sch001 Any change to or extension of projects listed in this...
s.sch001 (1) Projects for the restructuring of rural land holdings.
s.sch001 (1) Quarries, open-cast mining and peat extraction.
s.sch001 (1) Industrial installations for the production of electricity, steam and...
s.sch001 (1) Installations for the production of pig iron or steel...
s.sch001 (1) Coke ovens (that is to say, dry coal distillation)....
s.sch001 (1) Treatment of intermediate chemical products. (2) Production of chemicals....
s.sch001 (1) Manufacture of vegetable and animal oils and fats.
s.sch001 (1) Installations for the reprocessing of irradiated nuclear fuel.
s.sch001 (1) Industrial plants for the production of paper and board....
s.sch001 Manufacture and treatment of elastomer-based products.
s.sch001 (1) Industrial estate development projects. (2) Urban development projects, including...
s.sch001 (1) Ski-runs, ski-lifts and cable-cars and associated developments.
s.sch001 Permanent racing and test tracks for motorized vehicles.
s.sch001 Installations for the disposal of waste.
s.sch001 Waste-water treatment plants.
s.sch001 Sludge-deposition sites.
s.sch001 Storage of scrap iron, including scrap vehicles.
s.sch001 Test benches for engines, turbines or reactors.
s.sch001 (1) Integrated works for the initial smelting of cast-iron and...
s.sch001 Installations for the manufacture of artificial mineral fibres.
s.sch001 Installations for the recovery or destruction of explosive substances.
s.sch001 Knackers' yards.
s.sch001 (1) Any change to or extension of projects listed in...
s.sch001 (1) Expressions used in both this schedule and in Directive...
s.sch001 Installations for— (a) the extraction of asbestos and for the...
s.sch001 Integrated chemical installations, that is to say, installations—
s.sch001 (1) Construction of— (a) lines for long-distance railway traffic; or...
s.sch001 (1) Inland waterways and ports for inland-waterway traffic which permit...
s.sch001 Waste disposal installations for— (a) the incineration;
s.sch002 The characteristics of plans and programmes, having regard, in particular...
s.sch002 Characteristics of the effects and of the area likely to...
s.sch003 An outline of the contents and main objectives of the...
s.sch003 A non-technical summary of the information provided under paragraphs 1...
s.sch003 The relevant aspects of the current state of the environment...
s.sch003 The environmental characteristics of areas likely to be significantly affected....
s.sch003 Any existing environmental problems which are relevant to the plan...
s.sch003 The environmental protection objectives, established at international or national level,...
s.sch003 The likely significant effects on the environment, including—
s.sch003 The measures envisaged to prevent, reduce and as fully as...
s.sch003 An outline of the reasons for selecting the alternatives dealt...
s.sch003 A description of the measures envisaged concerning monitoring in accordance...

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.