Journey
Higher-risk building registration checklist
Quick registration checklist for Principal Accountable Persons registering a higher-risk building with the Building Safety Regulator. Covers eligibility, required information, fees, and post-registration obligations.
6 milestones
references 1 guide
Is your building ready for registration?
Use this checklist to confirm you have everything needed before registering a higher-risk building with the Building Safety Regulator. Operating an unregistered higher-risk building is a criminal offence.
-
Confirm your building is higher-risk
- Building is at least 18 metres in height OR has at least 7 storeys
- Building contains at least 2 residential units
- Building is not excluded (hospitals, care homes, hotels, military, secure institutions are excluded from Part 4)
- Building is in England
-
Confirm who must register
- The Principal Accountable Person (PAP) must register the building
- If there is only one Accountable Person, they are automatically the PAP
- If there are multiple APs, the PAP is the one with the legal obligation for the structure and exterior of the building
- The PAP is typically the freeholder, head leaseholder, or management company with responsibility for the structure and exterior
-
Gather the required information
You must provide the following Key Building Information (KBI) during registration:
- Building address and location details
- Height and number of storeys
- Number of residential units
- Structural information - materials, construction type
- External wall materials including cladding details
- Energy supply arrangements
- Fire safety systems - alarms, sprinklers, dry/wet risers
- All Accountable Persons - names and contact details
-
Confirm fees
- Registration fee: 251 pounds per building
- Review of registration decision: 312 pounds (BSR charging scheme from 8 April 2026)
- There is currently no annual charge - BSR charges are per application or hourly
-
Register with BSR
- Go to the BSR registration service at register-high-rise-building.service.gov.uk
- Create an account or sign in
- Enter building details and Key Building Information
- Pay the registration fee (251 pounds)
- Await confirmation from BSR
Register a higher-risk building (full guide)
Detailed step-by-step guide to the registration process, including information requirements and ongoing obligations.
-
Post-registration obligations
Registration is just the start. After registering, you must:
- Prepare a safety case report - demonstrating how building safety risks are managed
- Maintain the golden thread - digital record of building safety information
- Establish a resident engagement strategy - consulting residents on safety matters
- Report mandatory occurrences - notify the BSR as soon as reasonably practicable, with a full report within 10 days
- Apply for a Building Assessment Certificate - within 28 days of being directed to by the BSR
- Notify changes - inform the BSR within 28 days of becoming aware of any changes to Key Building Information