Building control and Building Regulations approval
How to get Building Regulations approval for construction work - application types, competent person schemes, inspection process, and …
Install EV chargepoints and access government grants.
You must use an OZEV-approved installer to get a government grant for installing EV chargepoints. From 15 June 2022, new buildings with 10 or more parking spaces must have EV charging. All chargepoints must have smart functionality from July 2022. Check the current per-site limit before applying for the Workplace Charging Scheme grant.
How to get Building Regulations approval for construction work - application types, competent person schemes, inspection process, and …
How to get new sewers adopted by the water and sewerage company under Section 104 of the Water …
How to design and install foul and surface water drainage that meets Approved Document H requirements. Covers pipe …
How to design and construct sustainable drainage systems (SuDS) for new developments. Covers CIRIA C753 design principles, SuDS …
Pre-start compliance checklist for drainage and utility infrastructure works. Covers Section 104 sewer adoption, Approved Document H, confined …
Installing electric vehicle charging infrastructure can help your business attract customers and meet Building Regulations requirements. Government grants are available to help with installation costs.
Charge points sold or supplied by retailers or installers from 30 June 2022 must have 'smart' functionality. The duty falls on the seller or supplier, not an end-user business that merely installs a charge point it acquired.