Transport & Logistics UK-wide

EV Charging Infrastructure

Install EV chargepoints and access government grants.

Guide summary

You must use an OZEV-approved installer to get a government grant for installing EV chargepoints. From 15 June 2022, new buildings with 10 or more parking spaces must have EV charging. All chargepoints must have smart functionality from July 2022. Check the current per-site limit before applying for the Workplace Charging Scheme grant.

  • Use an OZEV-approved installer to qualify for grants
  • New buildings with 10+ parking spaces need EV charging from 15 June 2022
  • Scotland has different rules – check Section 7 of Building Regulations
  • All chargepoints from July 2022 must have smart functionality
  • Chargepoints sold from 30 June 2022 must be smart – duty on seller
  • Follow standard BS EN IEC 61851 for safety and compatibility
  • Public chargepoints must offer contactless payment and be reliable
  • Check OZEV guidance for per-site socket limits on Workplace Charging Scheme
  • Landlords can apply for a separate EV chargepoint grant for residential properties
On this page

Installing electric vehicle charging infrastructure can help your business attract customers and meet Building Regulations requirements. Government grants are available to help with installation costs.

Smart charging

Charge points sold or supplied by retailers or installers from 30 June 2022 must have 'smart' functionality. The duty falls on the seller or supplier, not an end-user business that merely installs a charge point it acquired.