Northern Ireland Statutory Rule 2000 Northern Ireland Repealed

Building Regulations (Northern Ireland) 2000

At a glance

What's here

54 compliance obligations

Who this Act binds

Business-side actors with duties under this Act, ranked by how often they appear.

  • Trader 20
  • Contractor 17
  • Any Person 6
  • Client 4
  • Designer 1
  • Applicant 1
  • Operator 1

Plus 4 non-business duties on Crown ministers, regulators, local authorities or tribunals — shown collapsed under each section below.

Other Acts binding the same actors

For each actor bound by this Act, the other UK Acts that bind them most often. Useful for understanding the full compliance landscape facing each role.

Traders also bound by 826 other Acts (top 5 shown)
Contractors also bound by 178 other Acts (top 5 shown)
Any Person also bound by 2338 other Acts (top 5 shown)
Clients also bound by 65 other Acts (top 5 shown)
Designers also bound by 11 other Acts (top 5 shown)
Applicants also bound by 294 other Acts (top 5 shown)
Operators also bound by 730 other Acts (top 5 shown)

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Part V — Glazing

s.reg.v2

Impact with glazing

  • Install safety glazing to prevent cutting and piercing injuries Contractor
s.reg.v3

Transparent glazing

  • Make glass and transparent glazing visible Any Person
s.reg.v4

Safe opening and closing of windows, skylights and ventilators

  • Ensure windows and skylights can be operated safely Any Person
s.reg.v5

Safe means of access for cleaning glazing

  • Provide safe access for cleaning windows and glazing Client
Browse 2 other sections in this Part — procedural / definitional / commencement
s.reg.v1

Application and interpretation

s.reg.v6

Deemed-to-satisfy provisions for regulations V2, V3, V4 and V5

Part L — Heat-producing appliances and liquefied petroleum gas installations

s.reg.l2

Heat-producing appliances and associated constructions

  • Ensure safe installation of heat-producing appliances Contractor
s.reg.l3

Prevention of smoke emission

  • Ensure heating and cooking appliances can burn fuel smokelessly Trader
s.reg.l4

LPG fixed installations

  • Ensure LPG fixed installations are safe and fit for purpose Contractor
s.reg.l5

Separation distances from an existing LPG storage tank

  • Maintain safe separation distances from existing LPG storage tanks Trader
Browse 2 other sections in this Part — procedural / definitional / commencement
s.reg.l1

Interpretation and application

s.reg.l6

Deemed-to-satisfy provisions for regulations L2, L4 and L5

Part C — Preparation of site and resistance to moisture

s.reg.c2

Preparation of site and resistance to dangerous and harmful substances

  • Prepare site and protect building from harmful substances and radon Trader
s.reg.c3

Subsoil drainage

  • Ensure adequate subsoil drainage or protection for buildings Trader
s.reg.c4

Resistance to ground moisture and weather

  • Protect buildings from ground moisture and weather Contractor
s.reg.c5

Condensation

  • Design and build to prevent harmful condensation Trader
Browse 2 other sections in this Part — procedural / definitional / commencement
s.reg.c1

Application and interpretation

s.reg.c6

Deemed-to-satisfy provisions for regulations C2(2), C4 and C5

Part D — Structure

s.reg.d1

Stability

  • Ensure the structural stability of buildings Trader
s.reg.d2

Disproportionate collapse

  • Design buildings to prevent disproportionate collapse Trader
Browse 1 other section in this Part — procedural / definitional / commencement
s.reg.d3

Deemed-to-satisfy provisions for regulations D1 and D2

Schedules

Browse 24 other Schedules — structural / supplementary
s.sch001

Buildings controlled under other legislation

s.sch001

Buildings not frequented by people

s.sch001

Buildings for agriculture and keeping of animals

s.sch001

Temporary buildings

s.sch001

Ancillary buildings

s.sch001

Small detached buildings

s.sch001

Extensions

s.sch001

Other buildings

s.sch002

Calculations for the purposes of regulations F2 and F3(2) and...

s.sch002

Soil investigation report.

s.sch002

Details of measures proposed for protection against radon.

s.sch003

Key to Map

s.sch003

Notes to Map

s.schedule/2/part/a/crossheading/1_paragraph/1n1

Rule A: General

s.schedule/2/part/a/crossheading/1_paragraph/1n11

Rule F: Additional requirements

s.schedule/2/part/a/crossheading/1_paragraph/1n3

Rule B: Erection of buildings

s.schedule/2/part/a/crossheading/1_paragraph/1n5

Rule C: Alterations and extensions

s.schedule/2/part/a/crossheading/1_paragraph/1n7

Rule D: Services and fittings

s.schedule/2/part/a/crossheading/1_paragraph/1n9

Rule E: Material changes of use

Other sections — not classified into a Part

These sections sit outside the numbered Parts — usually provisions added or moved by later amendments.

s.reg.a11

Notice of commencement and completion of certain stages of work

  • Notify the district council of construction starts and completions Operator
s.reg.a13

Completion certificates

Other duties (1) — Crown / regulator
  • District councils must issue completion certificates upon request Local authority
s.reg.a14

Testing of drains and private sewers

Other duties (1) — Crown / regulator
  • District council may test drains and private sewers Local authority
s.reg.a15

Sampling of materials

Other duties (1) — Crown / regulator
  • Local authority officers may take samples of building materials Local authority
s.reg.a17

Application for dispensation or relaxation

  • Submit applications for building regulation relaxations in duplicate Applicant
s.reg.a18

Appeals and prescribed periods

Other duties (1) — Crown / regulator
  • District councils must notify applicants of appeal rights and process Local authority
s.reg.b2

Fitness of materials and workmanship

  • Ensure all materials and workmanship meet health and safety standards Contractor
s.reg.b3

Suitability of certain materials

  • Use durable wall and roof materials and ensure maintenance access Contractor
s.reg.b4

Urea formaldehyde foam

  • Restrict the use of urea formaldehyde foam in construction Contractor
s.reg.b5

Preservative treatment of timber

  • Apply preservative treatment to timber where necessary Contractor
s.reg.e2

Means of escape

  • Design and construct buildings with adequate fire detection and escape routes Trader
s.reg.e3

Internal fire spread – Linings

  • Ensure internal wall and ceiling linings meet fire safety standards Contractor
s.reg.e4

Internal fire spread – Structure

  • Ensure buildings are fire-stable and inhibit fire and smoke spread Trader
s.reg.e5

External fire spread

  • Design and build external walls and roofs to resist fire spread Trader
s.reg.e6

Facilities and access for the Fire Brigade

  • Provide fire brigade access and facilities in building design Trader
s.reg.f2

Building fabric

  • Use energy-efficient materials in building construction Trader
s.reg.f4

Insulation of pipes, ducts and hot water storage vessels

  • Insulate pipes, ducts, and hot water storage vessels Contractor
s.reg.g2

Separating walls and separating floors

  • Ensure walls and floors provide adequate sound insulation Contractor
s.reg.g3

Existing walls and floors which become separating walls and separating floors

  • Ensure sound insulation in converted walls and floors Contractor
s.reg.h2

Provision of stairs in dwellings

  • Provide stairs in multi-storey dwellings Contractor
s.reg.h3

Stairs, ladders, ramps and landings

  • Ensure safety of stairs, ladders, ramps, and landings Any Person
s.reg.h4

Guarding

  • Install safe guarding on stairs, floors, and roofs Any Person
s.reg.h5

Vehicle loading bays

  • Design and build vehicle loading bays to minimize collision risks Client
s.reg.h6

Protection against impact from and trapping by doors

  • Ensure doors and gates are safe from impact, falling, or trapping Trader
s.reg.h7

Protection from collision with open windows, skylights or ventilators

  • Protect people from colliding with open windows or skylights Designer
s.reg.j2

Solid waste storage

  • Provide adequate and safe storage for solid waste Trader
s.reg.j3

Waste chute systems

  • Ensure waste chute systems are hygienic and fire-safe Client
s.reg.k2

Means of ventilation

  • Provide adequate ventilation in buildings Trader
s.reg.k3

Ventilation of car parks

  • Provide adequate ventilation for car parks Client
s.reg.n2

Drainage systems

  • Ensure buildings have adequate drainage and sanitary pipework Trader
s.reg.n3

Sanitary pipework

  • Ensure sanitary pipework is safe, hygienic, and accessible Contractor
s.reg.n4

Underground foul drainage

  • Ensure underground foul drainage is hygienic and accessible Contractor
s.reg.n5

Rain-water drainage

  • Install and maintain compliant rain-water drainage systems Contractor
s.reg.n6

Cesspools, septic tanks and similar structures

  • Ensure cesspools and septic tanks meet design and safety standards Any Person
s.reg.p2

Provision of sanitary appliances

  • Ensure dwellings and buildings have proper sanitary and washing facilities Contractor
s.reg.p5

Unvented hot water storage systems

  • Install safety and pressure controls on unvented hot water systems Any Person
s.reg.r2

Access and use

  • Ensure buildings provide reasonable access and use for disabled people Trader
s.reg.r3

Sanitary accommodation and sanitary conveniences

  • Provide accessible toilets in non-domestic buildings and dwellings Trader
s.reg.r4

Audience or spectator seating

  • Provide accessible seating for disabled people Trader
Browse 125 other sections
s.access and use

Access and use

s.appeals and prescribed periods

Appeals and prescribed periods

s.application and interpretation

Application and interpretation

s.application for dispensation or relaxation

Application for dispensation or relaxation

s.application to alterations and extensions

Application to alterations and extensions

s.application to erection of buildings

Application to erection of buildings

s.application to material change of use

Application to material change of use

s.application to services and fittings

Application to services and fittings

s.audience or spectator seating

Audience or spectator seating

s.building fabric

Building fabric

s.cesspools, septic tanks and similar structures

Cesspools, septic tanks and similar structures

s.citation and commencement

Citation and commencement

s.completion certificates

Completion certificates

s.condensation

Condensation

s.deemed-to-satisfy provisions

Deemed-to-satisfy provisions

s.deemed-to-satisfy provisions for regulation p5

Deemed-to-satisfy provisions for regulation P5

s.deemed-to-satisfy provisions for regulations b2, b

Deemed-to-satisfy provisions for regulations B2, B4 and B5

s.deemed-to-satisfy provisions for regulations c2(2)

Deemed-to-satisfy provisions for regulations C2(2), C4 and C5

s.deemed-to-satisfy provisions for regulations d1 an

Deemed-to-satisfy provisions for regulations D1 and D2

s.deemed-to-satisfy provisions for regulations e2, e

Deemed-to-satisfy provisions for regulations E2, E3, E4, E5 and E6

s.deemed-to-satisfy provisions for regulations f2, f

Deemed-to-satisfy provisions for regulations F2, F3 and F4

s.deemed-to-satisfy provisions for regulations g2 an

Deemed-to-satisfy provisions for regulations G2 and G3

s.deemed-to-satisfy provisions for regulations h3, h

Deemed-to-satisfy provisions for regulations H3, H4, H5, H6 and H7

s.deemed-to-satisfy provisions for regulations j2(1)

Deemed-to-satisfy provisions for regulations J2(1)(b) and J3

s.deemed-to-satisfy provisions for regulations k2 an

Deemed-to-satisfy provisions for regulations K2 and K3

s.deemed-to-satisfy provisions for regulations l2, l

Deemed-to-satisfy provisions for regulations L2, L4 and L5

s.deemed-to-satisfy provisions for regulations n3, n

Deemed-to-satisfy provisions for regulations N3, N4 and N5

s.deemed-to-satisfy provisions for regulations r2, r

Deemed-to-satisfy provisions for regulations R2, R3 and R4

s.deemed-to-satisfy provisions for regulations v2, v

Deemed-to-satisfy provisions for regulations V2, V3, V4 and V5

s.disproportionate collapse

Disproportionate collapse

s.drainage systems

Drainage systems

s.exemptions

Exemptions

s.exercise of power of dispensation or relaxation

Exercise of power of dispensation or relaxation

s.existing walls and floors which become separating

Existing walls and floors which become separating walls and separating floors

s.external fire spread

External fire spread

s.facilities and access for the fire brigade

Facilities and access for the Fire Brigade

s.fitness of materials and workmanship

Fitness of materials and workmanship

s.giving of notices and deposit of plans

Giving of notices and deposit of plans

s.guarding

Guarding

s.heat-producing appliances and associated construct

Heat-producing appliances and associated constructions

s.impact with glazing

Impact with glazing

s.insulation of pipes, ducts and hot water storage v

Insulation of pipes, ducts and hot water storage vessels

s.internal fire spread – linings

Internal fire spread – Linings

s.internal fire spread – structure

Internal fire spread – Structure

s.interpretation

Interpretation

s.interpretation and application

Interpretation and application

s.lpg fixed installations

LPG fixed installations

s.means of escape

Means of escape

s.means of ventilation

Means of ventilation

s.notice of commencement and completion of certain s

Notice of commencement and completion of certain stages of work

s.preparation of site and resistance to dangerous an

Preparation of site and resistance to dangerous and harmful substances

s.preservative treatment of timber

Preservative treatment of timber

s.prevention of smoke emission

Prevention of smoke emission

s.protection against impact from and trapping by doo

Protection against impact from and trapping by doors

s.protection from collision with open windows, skyli

Protection from collision with open windows, skylights or ventilators

s.provision of sanitary appliances

Provision of sanitary appliances

s.provision of stairs in dwellings

Provision of stairs in dwellings

s.rain-water drainage

Rain-water drainage

s.reg.a1

Citation and commencement

s.reg.a10

Giving of notices and deposit of plans

s.reg.a12

Regularisation certificates

s.reg.a16

Exercise of power of dispensation or relaxation

s.reg.a19

Revocations

s.reg.a2

Interpretation

s.reg.a3

Deemed-to-satisfy provisions

s.reg.a4

Transitional provisions

s.reg.a5

Exemptions

s.reg.a6

Application to erection of buildings

s.reg.a7

Application to alterations and extensions

s.reg.a8

Application to services and fittings

s.reg.a9

Application to material change of use

s.reg.b1

Interpretation

s.reg.b6

Deemed-to-satisfy provisions for regulations B2, B4 and B5

s.reg.e1

Application and interpretation

s.reg.e7

Deemed-to-satisfy provisions for regulations E2, E3, E4, E5 and E6

s.reg.f1

Application and interpretation

s.reg.f3

Space heating, hot water supply and artificial lighting systems

s.reg.f5

Deemed-to-satisfy provisions for regulations F2, F3 and F4

s.reg.g1

Application and interpretation

s.reg.g4

Deemed-to-satisfy provisions for regulations G2 and G3

s.reg.h1

Application and interpretation

s.reg.h8

Deemed-to-satisfy provisions for regulations H3, H4, H5, H6 and H7

s.reg.j1

Interpretation

s.reg.j4

Deemed-to-satisfy provisions for regulations J2(1)(b) and J3

s.reg.k1

Application and interpretation

s.reg.k4

Deemed-to-satisfy provisions for regulations K2 and K3

s.reg.n1

Interpretation and application

s.reg.n7

Deemed-to-satisfy provisions for regulations N3, N4 and N5

s.reg.p1

Interpretation

s.reg.p4

Sanitary accommodation

s.reg.p6

Deemed-to-satisfy provisions for regulation P5

s.reg.r1

Application and interpretation

s.reg.r5

Deemed-to-satisfy provisions for regulations R2, R3 and R4

s.regularisation certificates

Regularisation certificates

s.resistance to ground moisture and weather

Resistance to ground moisture and weather

s.revocations

Revocations

s.safe means of access for cleaning glazing

Safe means of access for cleaning glazing

s.safe opening and closing of windows, skylights and

Safe opening and closing of windows, skylights and ventilators

s.sampling of materials

Sampling of materials

s.sanitary accommodation

Sanitary accommodation

s.sanitary accommodation and sanitary conveniences

Sanitary accommodation and sanitary conveniences

s.sanitary pipework

Sanitary pipework

s.separating walls and separating floors

Separating walls and separating floors

s.separation distances from an existing lpg storage

Separation distances from an existing LPG storage tank

s.solid waste storage

Solid waste storage

s.space heating, hot water supply and artificial lig

Space heating, hot water supply and artificial lighting systems

s.stability

Stability

s.stairs, ladders, ramps and landings

Stairs, ladders, ramps and landings

s.subsoil drainage

Subsoil drainage

s.suitability of certain materials

Suitability of certain materials

s.testing of drains and private sewers

Testing of drains and private sewers

s.transitional provisions

Transitional provisions

s.transparent glazing

Transparent glazing

s.underground foul drainage

Underground foul drainage

s.unvented hot water storage systems

Unvented hot water storage systems

s.urea formaldehyde foam

Urea formaldehyde foam

s.vehicle loading bays

Vehicle loading bays

s.ventilation of car parks

Ventilation of car parks

s.waste chute systems

Waste chute systems

Explore more

Browse legislation

Find other UK business legislation with related guidance.