UK Statutory Instrument 2011 United Kingdom

The Town and Country Planning (Environmental Impact Assessment) Regulations 2011

At a glance

Enforced by

Environment Agency, DEFRA

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Part 1 — General

Browse 3 other sections in this Part — procedural / definitional / commencement

Part 2 — Screening

Browse 3 other sections in this Part — procedural / definitional / commencement

Part 3 — Procedures Concerning Applications for Planning Permission

Browse 7 other sections in this Part — procedural / definitional / commencement

Part 4 — Preparation of Environmental Statements

Browse 3 other sections in this Part — procedural / definitional / commencement

Part 6 — Availability of Directions etc and Notification of Decisions

Browse 2 other sections in this Part — procedural / definitional / commencement

Part 7 — Development By a Local Planning Authority

Browse 2 other sections in this Part — procedural / definitional / commencement

Part 8 — Restrictions of Grants of Permission

Browse 4 other sections in this Part — procedural / definitional / commencement

Part 11 — Development with Significant Transboundary Effects

Browse 2 other sections in this Part — procedural / definitional / commencement

Part 12 — Projects serving national defence purposes

Browse 3 other sections in this Part — procedural / definitional / commencement

Schedules

Browse 56 other Schedules — structural / supplementary
s.sch001

Crude-oil refineries (excluding undertakings manufacturing only lubricants from crude oil)...

s.sch001

Waste disposal installations for the incineration or chemical treatment (as...

s.sch001

Groundwater abstraction or artificial groundwater recharge schemes where the annual...

s.sch001

(a) Works for the transfer of water resources, other than...

s.sch001

Waste water treatment plants with a capacity exceeding 150,000 population...

s.sch001

Extraction of petroleum and natural gas for commercial purposes where...

s.sch001

Dams and other installations designed for the holding back or...

s.sch001

Pipelines with a diameter of more than 800 millimetres and...

s.sch001

Installations for the intensive rearing of poultry or pigs with...

s.sch001

Industrial plants for— (a) the production of pulp from timber...

s.sch001

Quarries and open-cast mining where the surface of the site...

s.sch001

(a) Thermal power stations and other combustion installations with a...

s.sch001

Installations for storage of petroleum, petrochemical or chemical products with...

s.sch001

Any change to or extension of development listed in this...

s.sch001

Storage sites pursuant to Directive 2009/31/ EC of the European...

s.sch001

Installations for the capture of carbon dioxide streams for the...

s.sch001

(a) Installations for the reprocessing of irradiated nuclear fuel;

s.sch001

(a) Integrated works for the initial smelting of cast-iron and...

s.sch001

Installations for the extraction of asbestos and for the processing...

s.sch001

Integrated chemical installations, that is to say, installations for the...

s.sch001

(a) Construction of lines for long-distance railway traffic and of...

s.sch001

(a) Inland waterways and ports for inland-waterway traffic which permit...

s.sch001

Waste disposal installations for the incineration, chemical treatment (as defined...

s.sch002

In the table below— “ area of the works ”...

s.sch002

The table below sets out the descriptions of development and...

s.sch003

Characteristics of development

s.sch003

Location of development

s.sch003

Characteristics of the potential impact

s.sch004

A non-technical summary of the information provided under paragraphs 1...

s.sch004

An indication of any difficulties (technical deficiencies or lack of...

s.sch006

The Town and Country Planning (General Permitted Development) Order 1995

s.sch006

In regulation 2(1), for the definition of “environmental statement”, substitute...

s.sch006

The Planning (National Security Directions and Appointed Representatives) (England) Rules 2006

s.sch006

In regulation 6(8), for the definition of “ EIA application”,...

s.sch006

Environmental Impact Assessment (Agriculture) (England) (No 2) Regulations 2006

s.sch006

In regulation 3(2)(b), for “the Town and Country Planning (Environmental...

s.sch006

The Environmental Impact Assessment and Natural Habitats (Extraction of Minerals by Marine Dredging) (England and Northern Ireland) Regulations 2007

s.sch006

In regulation 2(1), in the definition of “dredging”, for “the...

s.sch006

The Town and Country Planning (Development Management Procedure) (England) Order 2010

s.sch006

In regulation 2(1), in the definition of “ EIA development”,...

s.sch006

For regulation 25(2), substitute— (2) The Secretary of State may...

s.sch006

In article 3(10), for “the Town and Country Planning (Environmental...

s.sch006

In regulation 34(13), for “the Town and Country Planning (Environmental...

s.sch006

In article 3(11) for “regulation 4(7)” substitute “ regulation 4(8)...

s.sch006

The Gas Transporter Pipe-line Works (Environmental Impact Assessment) Regulations 1999

s.sch006

In regulation 2(1), for the definition of “the 1999 EIA...

s.sch006

In regulation 4(3), for “the 1999 EIA Regulations” (at both...

s.sch006

The Environmental Impact Assessment (Forestry) (England and Wales) Regulations 1999

s.sch006

In regulation 3(1)(c)(ii), for “the Town and Country Planning (Environmental...

s.sch006

The Town and Country Planning (Major Infrastructure Project Inquiries Procedure) (England) Rules 2005

Other sections — not classified into a Part

These sections exist in the Act but the contents-of-Parts walker did not place them under a Part. Likely amendments or sections inserted out of the original Part structure.

Browse 68 other unclassified sections
s.001

Citation, commencement and application

s.002

Interpretation

s.003

Prohibition on granting planning permission or subsequent consent without consideration of environmental information

s.004

General provisions relating to screening

s.005

Requests for screening opinions of the local planning authority

s.006

Requests for screening directions of the Secretary of State

s.007

Applications which appear to require screening opinion

s.008

Subsequent applications where environmental information previously provided

s.009

Subsequent applications where environmental information not previously provided

s.010

Application made to a local planning authority without an environmental statement

s.010

Applications made directly to the Secretary of State without an environmental statement

s.011

Application referred to the Secretary of State without an environmental statement

s.012

Appeal to the Secretary of State without an environmental statement

s.013

Scoping opinions of the local planning authority

s.014

Scoping directions of the Secretary of State

s.015

Procedure to facilitate preparation of environmental statements

s.016

Procedure where an environmental statement is submitted to a local planning authority

s.017

Publicity where an environmental statement is submitted after the planning application

s.018

Provision of copies of environmental statements and further information for the Secretary of State on referral or appeal

s.019

Procedure where an environmental statement is submitted to the Secretary of State

s.020

Availability of copies of environmental statements

s.021

Charges for copies of environmental statements

s.022

Further information and evidence respecting environmental statements

s.023

Availability of opinions, directions etc for inspection

s.024

Duties to inform the public and the Secretary of State of final decisions

s.025

Modifications where application by a local planning authority

s.026

Screening opinions and directions

s.027

Old simplified planning zone schemes or enterprise orders

s.028

New simplified planning zone schemes or enterprise zone orders

s.029

Local development orders

s.029

Neighbourhood development orders

s.030

Interpretation

s.031

Prohibition on the grant of planning permission for unauthorised EIA development

s.032

Screening opinions of the local planning authority

s.033

Screening directions of the Secretary of State

s.034

Provision of information

s.035

Appeal to the Secretary of State without a screening opinion or screening direction

s.036

Appeal to the Secretary of State without an environmental statement

s.037

Procedure where an environmental statement is submitted to the Secretary of State

s.038

Further information and evidence respecting environmental statements

s.039

Publicity for environmental statements or further information

s.040

Public inspection of documents

s.041

Significant transboundary effects

s.042

General application of the Regulations to ROMP applications

s.043

Modification of provisions on prohibition of granting planning permission or subsequent consent

s.044

Modification of provisions on application to local planning authority without an environmental statement

s.045

Disapplication of Regulations and modifications of provisions on application referred to or appealed to the Secretary of State without an environmental statement

s.046

Substitution of references to section 78 right of appeal and modification of provisions on appeal to the Secretary of State without an environmental statement

s.047

Modification of provisions on preparation, publicity and procedures on submission of environmental statements

s.048

Modification of provisions on application to the High Court and giving of directions

s.049

Suspension of minerals development

s.050

Determination of conditions and right of appeal on non-determination

s.051

ROMP application by a mineral planning authority

s.052

ROMP applications: duty to make a prohibition order after two years suspension of permission

s.053

Development in England likely to have significant effects in another EEA State

s.054

Projects in another EEA State likely to have significant transboundary effects

s.055

Projects serving national defence purposes in Scotland

s.056

Projects serving national defence purposes in Wales

s.057

Projects serving national defence purposes in Northern Ireland

s.058

Service of notices etc

s.059

Application to the High Court

s.060

Hazardous waste and material change of use

s.061

Extension of the period for an authority's decision on a planning application

s.062

Extension of the power to provide in a development order for the giving of directions as respects the manner in which planning applications are dealt with

s.063

Application to the Crown

s.064

Review

s.065

Revocation of statutory instruments and transitional provisions

s.066

Consequential amendments

Enforcement and responsible bodies

The regulators that administer or enforce this legislation.

Environmental protection in England. Regulates waste, emissions, water quality, flood risk, and environmental permits for industrial activities. Enforces environmental law and issues …

Department for Environment, Food and Rural Affairs

Government department responsible for environmental protection, food production and standards, agriculture, fisheries, and rural communities. Sets environmental policy and works with agencies …

Explore more

Browse legislation

Find other UK business legislation with related guidance.

Regulators

Learn more about the bodies that enforce this legislation.